Orange County NC Website
DocuSign Envelope ID:07A4359F-6D47-4987-B1F1-BF667ACBB3BA <br /> SUBMITTAL PROCEDURES-013300 <br /> 2. Field Test Reports: Submit written reports indicating and interpreting results of field <br /> tests performed either during installation of product or after product is installed in its <br /> final location,for compliance with requirements in the Contract Documents. <br /> 3. Material Test Reports: Submit reports written by a qualified testing agency, on testing <br /> agency's standard form, indicating and interpreting test results of material for <br /> compliance with requirements in the Contract Documents. <br /> 4. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on <br /> testing agency's standard form, indicating and interpreting results of tests performed <br /> before installation of product, for compliance with performance requirements in the <br /> Contract Documents. <br /> 5. Product Test Reports: Submit written reports indicating that current product produced <br /> by manufacturer complies with requirements in the Contract Documents. Base reports <br /> on evaluation of tests performed by manufacturer and witnessed by a qualified testing <br /> agency, or on comprehensive tests performed by a qualified testing agency. <br /> 1.8 CONTRACTOR'S REVIEW <br /> A. Action Submittals and Informational Submittals: Review each submittal and check for <br /> coordination with other Work of the Contract and for compliance with the Contract <br /> Documents. Note corrections and field dimensions. Mark with approval stamp before <br /> submitting to Engineer. <br /> B. Contractor's Approval: Indicate Contractor's approval for each submittal with Contractor's <br /> signature or seal. Include name of reviewer, date of Contractor's approval, and statement <br /> certifying that submittal has been reviewed, checked, and approved for compliance with the <br /> Contract Documents. <br /> 1. Engineer will not review submittals received from Contractor that do not have <br /> Contractor's review and approval. <br /> 1.9 ENGINEER'S REVIEW <br /> A. Action Submittals: Engineer will review each submittal, indicate corrections or revisions <br /> required, and return. <br /> 1. PDF Submittals: Engineer will indicate, via markup on each submittal, the appropriate <br /> action. <br /> B. Informational Submittals: Engineer will review each submittal and will not return it, or will <br /> return it if it does not comply with requirements. Engineer will forward each submittal to <br /> appropriate party. <br /> C. Partial submittals prepared for a portion of the Work will be reviewed when use of partial <br /> submittals has received prior approval from Engineer. <br /> Orange County Solid Waste Drainage Repairs DAA 2200365/TRC 017055.0000.0000 <br /> Drainage Repair Project November 2023 <br /> Orange County, INC 013300-6/7 <br />