Browse
Search
2024-195-E-Solid Waste-Moffat Pipe-Drainage Repairs
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-195-E-Solid Waste-Moffat Pipe-Drainage Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:07:49 AM
Creation date
5/28/2024 7:59:25 AM
Metadata
Fields
Template:
Contract
Date
3/31/2024
Contract Starting Date
3/31/2024
Contract Ending Date
4/7/2024
Contract Document Type
Contract
Amount
$341,995.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:07A4359F-6D47-4987-B1F1-BF667ACBB3BA <br /> SUBMITTAL PROCEDURES-013300 <br /> 3. Resubmittal Review: Allow 15 days for review of each resubmittal. <br /> D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal. <br /> 1. Note date and content of previous submittal. <br /> 2. Note date and content of revision in label or title block, and clearly indicate extent of <br /> revision. <br /> 3. Resubmit submittals until they are marked with approval notation from Engineer. <br /> E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, <br /> fabricators, installers, authorities having jurisdiction, and others as necessary for performance <br /> of construction activities. Show distribution on transmittal forms. <br /> F. Use for Construction: Retain complete copies of submittals on Project site. Use only final <br /> action submittals that are marked with approval notation from Engineer's action stamp. <br /> 1.7 SUBMITTAL REQUIREMENTS <br /> A. Product Data: Collect information into a single submittal for each element of construction and <br /> type of product or equipment. <br /> 1. If information must be specially prepared for submittal because standard published data <br /> are unsuitable for use, submit as Shop Drawings, not as Product Data. <br /> 2. Mark each copy of each submittal to show which products and options are applicable. <br /> 3. Include the following information, as applicable: <br /> a. Manufacturer's product specifications. <br /> b. Standard color charts. <br /> C. Statement of compliance with specified referenced standards. <br /> d. Testing by recognized testing agency. <br /> e. Application of testing agency labels and seals. <br /> f. Notation of coordination requirements. <br /> g. Availability and delivery time information. <br /> 4. Submit Product Data before Shop Drawings, and before or concurrently with Samples. <br /> B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base <br /> Shop Drawings on reproductions of the Contract Documents or standard printed data. <br /> 1. Preparation: Fully illustrate requirements in the Contract Documents. Include the <br /> following information, as applicable: <br /> a. Identification of products. <br /> b. Schedules. <br /> C. Compliance with specified standards. <br /> d. Notation of coordination requirements. <br /> e. Notation of dimensions established by field measurement. <br /> f. Relationship and attachment to adjoining construction clearly indicated. <br /> Orange County Solid Waste Drainage Repairs DAA 2200365/TRC 017055.0000.0000 <br /> Drainage Repair Project November 2023 <br /> Orange County, NC 013300-4/7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.