Browse
Search
2024-195-E-Solid Waste-Moffat Pipe-Drainage Repairs
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-195-E-Solid Waste-Moffat Pipe-Drainage Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:07:49 AM
Creation date
5/28/2024 7:59:25 AM
Metadata
Fields
Template:
Contract
Date
3/31/2024
Contract Starting Date
3/31/2024
Contract Ending Date
4/7/2024
Contract Document Type
Contract
Amount
$341,995.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:07A4359F-6D47-4987-B1F1-BF667ACBB3BA <br /> SUBMITTAL PROCEDURES-013300 <br /> required to maintain orderly progress of the Work and those required early because of <br /> long lead time for manufacture or fabrication. <br /> 3. Final Submittal Schedule: Submit concurrently with the first complete submittal of <br /> Contractor's construction schedule. <br /> a. Submit revised submittal schedule as required to reflect changes in current status <br /> and timing for submittals. <br /> 4. Format: Arrange the following information in a tabular format: <br /> a. Scheduled date for first submittal. <br /> b. Specification Section number and title. <br /> C. Submittal Category: Action; informational. <br /> d. Name of subcontractor. <br /> e. Description of the Work covered. <br /> f. Scheduled date for Engineer's final release or approval. <br /> g. Scheduled dates for purchasing. <br /> h. Scheduled date of fabrication. <br /> i. Scheduled dates for installation. <br /> j. Activity or event number. <br /> 1.5 SUBMITTAL FORMATS <br /> A. Submittal Information: Include the following information in each submittal: <br /> 1. Project name. <br /> 2. Date. <br /> 3. Name of Engineer. <br /> 4. Name of Contractor. <br /> 5. Name of firm or entity that prepared submittal. <br /> 6. Names of subcontractor, manufacturer, and supplier. <br /> 7. Unique submittal number, including revision identifier. Include Specification Section <br /> number with sequential alphanumeric identifier and alphanumeric suffix for <br /> resubmittals. <br /> 8. Category and type of submittal. <br /> 9. Submittal purpose and description. <br /> 10. Number and title of Specification Section, with paragraph number and generic name for <br /> each of multiple items. <br /> 11. Drawing number and detail references, as appropriate. <br /> 12. Indication of full or partial submittal. <br /> 13. Location(s)where product is to be installed, as appropriate. <br /> 14. Other necessary identification. <br /> 15. Remarks. <br /> 16. Signature of transmitter. <br /> B. Options: Identify options requiring selection by Engineer. <br /> Orange County Solid Waste Drainage Repairs DAA 2200365/TRC 017055.0000.0000 <br /> Drainage Repair Project November 2023 <br /> Orange County, INC 013300-2/7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.