Orange County NC Website
DocuSign Envelope ID:07A4359F-6D47-4987-B1F1-BF667ACBB3BA <br /> SECTION 013300-SUBMITTAL PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and other Division 01 Specification Sections, apply to this Section. <br /> 1.2 SUMMARY <br /> A. Section Includes: <br /> 1. Submittal schedule requirements. <br /> 2. Administrative and procedural requirements for submittals. <br /> B. Related Requirements: <br /> 1. Section 014500 "Quality Control" for submitting test and inspection reports, and <br /> schedule of tests and inspections. <br /> 1.3 DEFINITIONS <br /> A. Action Submittals: Written and graphic information and physical samples that require <br /> Engineer's responsive action. Action submittals are those submittals indicated in individual <br /> Specification Sections as "action submittals." <br /> B. Informational Submittals: Written and graphic information and physical samples that do not <br /> require Engineer's responsive action. Submittals may be rejected for not complying with <br /> requirements. Informational submittals are those submittals indicated in individual <br /> Specification Sections as "informational submittals." <br /> 1.4 SUBMITTAL SCHEDULE <br /> A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in <br /> chronological order by dates required by construction schedule. Include time required for <br /> review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include <br /> additional time required for making corrections or revisions to submittals noted by Engineer <br /> and additional time for handling and reviewing submittals required by those corrections. <br /> 1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and <br /> Contractor's construction schedule. <br /> 2. Initial Submittal Schedule: Submit concurrently with startup construction schedule. <br /> Include submittals required during the first 60 days of construction. List those submittals <br /> Orange County Solid Waste Drainage Repairs DAA 2200365/TRC 017055.0000.0000 <br /> Drainage Repair Project November 2023 <br /> Orange County, NC 013300- 1/7 <br />