Browse
Search
2024-195-E-Solid Waste-Moffat Pipe-Drainage Repairs
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-195-E-Solid Waste-Moffat Pipe-Drainage Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:07:49 AM
Creation date
5/28/2024 7:59:25 AM
Metadata
Fields
Template:
Contract
Date
3/31/2024
Contract Starting Date
3/31/2024
Contract Ending Date
4/7/2024
Contract Document Type
Contract
Amount
$341,995.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:07A4359F-6D47-4987-B1F1-BF667ACBB3BA <br /> [Departmental Use Only] <br /> TITLE <br /> FY <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the IOth <br /> day of_April , 2024,by and between Moffat Pipe, Inc., (hereinafter called the "Contractor"), and Orange <br /> County, a political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange <br /> County," or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by TRC Egineers, Inc. (Sheet C1.0-05.0) dated 02/16/2024) <br /> b. Written specifications prepared by the Designer. <br /> c. Orange County Solid Waste Drainage Repairs proposal dated December, 2023 which fully <br /> describes the work to be performed, such work(hereinafter called the"Work"). <br /> Revised 01/24 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.