Orange County NC Website
45 <br /> Example - Getting More by Building Up <br /> New two-story Carrboro Elementary <br /> ak , <br /> At right: 100,000-square-foot footprint on existing site <br /> • Moving Carrboro ES students to newly ' <br /> vacated Frank Porter Graham <br /> Elementary would allow construction <br /> on top of the existing building <br /> footprint. _- <br /> • Outline shown in blue represents 100k h r ~, •' <br /> GSF, which is much larger than required r <br /> g <br /> and allows for more design flexibility. <br /> • Building a two-story school preserves •� � • ' <br /> paved surfaces, baseball field, and 71 �, <br /> green space. <br /> • Select buildings could remain for a cost <br /> 22 savings, if desired. CHCCS <br />