Browse
Search
Agenda 05-21-24; 6-c - Approval of Budget Amendment #9-A – Capital Reallocation for Orange County Schools
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-21-2024 Business Meeting
>
Agenda 05-21-24; 6-c - Approval of Budget Amendment #9-A – Capital Reallocation for Orange County Schools
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 2:55:38 PM
Creation date
5/16/2024 2:33:43 PM
Metadata
Fields
Template:
BOCC
Date
5/21/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for May 21, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-21-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> 4.2 Time is of the essence. The Contractor shall achieve Final Completion,as defined in the General <br /> Conditions on or before the date established for Final Completion in the. Supplemental <br /> Conditions. <br /> 4.3 The Supplemental Conditions contains certain specific dates that shall be adhered to and are <br /> the last acceptable dates unless modified in writing by mutual agreement between the <br /> Contractor and the Owner. All dates indicate midnight unless otherwise stipglated. The only <br /> exceptions to this schedule are defined in the General Conditions under 8.3 DELAYS AND <br /> EXTENSIONS OFTIME. <br /> 4.4 Should the Contractor fail to complete the Work on or before the dates stipulated for <br /> Substantial Completion and/or Final Completion, or such later date as may result from an <br /> extensions of time granted by the Owner, he shall pay the Owner, as liquidated damages the <br /> sums setforth in the General and Supplemental Conditions. <br /> Article 5 <br /> CONTRACT SUM <br /> 5.1 Provided that the Contractor shall strictly and completely perform all of its obligations under <br /> the Contract Documents, and subject only to additions and deductions by Modification or as <br /> otherwise provided in the. Contract Documents, the Owner shall pay to the Contractor, in <br /> current funds and at the time and in the installments hereinafter specified, the sum of Four <br /> Million Seven Hundred Ninety-Five Thousand Dollars ($4,795,000.00)herein referred to as the <br /> "Contract Sum". This amount includes the base bid and the Alternates in Section 2.2 <br /> 5.2 The Contract Sum includes the value engineering items and other contract modifications noted <br /> in Section 2 3'above that total S4,795,000.00. <br /> 5.3 Unit Prices are established as follows for the Project: <br /> (See Attached Sid Evaluation Form-Unit Prices(Exhibit B) <br /> Unit Price No.1 General Construction $57.00 Per CuYd <br /> Unit Price No.2 Plumbing A $50.00 Per Ft <br /> Section C,O veer-Gr3ntzactorAgreement C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.