Browse
Search
Agenda 05-21-24; 6-c - Approval of Budget Amendment #9-A – Capital Reallocation for Orange County Schools
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 05-21-2024 Business Meeting
>
Agenda 05-21-24; 6-c - Approval of Budget Amendment #9-A – Capital Reallocation for Orange County Schools
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 2:55:38 PM
Creation date
5/16/2024 2:33:43 PM
Metadata
Fields
Template:
BOCC
Date
5/21/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for May 21, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 05-21-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> 2.4 The Parties agree that the following allowances are included in the Contract Sum in Section 5.1 <br /> below: <br /> Allowances 1-5 (See Attached Bid Evaluation Form Allowances (Exhibit B) <br /> 2.5 The Contractor shall provide and pay for all materials,toots, equipment, labor and professional <br /> and non-professional services; and shall perform all other acts and supply all other things <br /> necessary, to fully and properly perform and complete the Work, as required by the Contract <br /> Documents. <br /> 2.6 The Contractor shall further provide and pay for all related facilities described in any of the <br /> Contract Documents, including all work expressly specified therein and such additionalwork as <br /> may be reasonably inferred therefrom, saving and excepting only such items of work as are <br /> specifically stated in the Contract Documents not to be the obligation of the Contractor. The <br /> totality of the obligations imposed upon the contractor by this Article and by all other <br /> provisions of the Contract Documents, as well as the structures to be built and the labor to be <br /> performed,is herein referred to as the"Work". <br /> Article 3 <br /> DESIGN CONSULTANT <br /> 3.1 The Design Consultant (as defined in the General Conditions) shall be Sud Associates P.A. <br /> whose address is 1813 Chapel Hill Road, Durham, NC 27707 however, that the .Owner may, <br /> without liability to the Contractor, unilaterally amend this Article from time to time by <br /> designating a different person or organization to act as its Design Consultant and so advising <br /> the Contractor in writing, at which time the person or organization so designated shall be the <br /> Design Consultant for purposes of this Contract. <br /> Article 4 <br /> TIME OF COMMENCEMENT AND COMPLETION <br /> 4,1 The Contractor shall commence the Work promptly upon the date established in the Notice to <br /> Proceed. if there is no Notice to Proceed,the date of commencement of the Work shall be the <br /> date of this Agreement or such other date as may be established herein. <br /> Section C,Owner-Contractor Agreement C 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.