Browse
Search
Agenda - 11-09-2005-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 11-09-2005
>
Agenda - 11-09-2005-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:52:21 AM
Creation date
8/29/2008 10:40:22 AM
Metadata
Fields
Template:
BOCC
Date
11/9/2005
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20051109
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: November 9, 2005 <br />Action Agenda <br />Item No. 3 <br />SUBJECT: Northern Park -Operations and Maintenance Costs and Project Timetable <br />DEPARTMENT: Recreation & Parks, ERCD PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Lori Taft, 245-2660 <br />1, Staff Memo re O&M Costs David Stancil, 245-2590 <br />2. Possible Timetable of Activities Marabeth Carr 969-3880 <br />PURPOSE: To consider preliminary cost estimates for the operation and maintenance <br />(O&M) of Northern Community Park (at the Northern Human Services Center), as well as a <br />timetable of possible pre-construction and construction activities. <br />BACKGROUND: On August 29, 2005, the Board reviewed information relative to the <br />proposed Northern Community Park, located on NC 86 seven miles north of Hillsborough <br />adjoining the Northern Human Services Center. This information included a memo on <br />preliminary cost estimates as well as a possible timetable of activities for construction, On <br />October 3, 2005, the Board approved the Master Plan for the Park. <br />An updated memo regarding O&M costs is attached. In general, R&P staff projects the need <br />to begin to expend start up capital and operational costs associated with the park at the time <br />construction begins (in the fall of 2006). Attachment 1 illustrates proposed operating and <br />capital funding needs for start-up and ongoing costs for the park, <br />A timetable for park construction (attached) envisions a site plan application submittal and <br />approval to be completed by .lanuary 2006, followed by preparation of construction drawings, <br />engineering studies and other bid documents in 2006. If the contracted drawings and <br />engineering work is expedited, staff believes that these could be completed and a bid <br />solicited by August 2006 and awarded in September 2006. This would provide for <br />construction to occur generally between October 2006 -September 2007, with a possible <br />park opening in the fall of 2007 or winter of 2007-08 (note -playing fields will take at least <br />one full year to establish and most likely will not be ready for use before the fall 2008 or <br />spring 2009). <br />
The URL can be used to link to this page
Your browser does not support the video tag.