Orange County NC Website
83 <br /> Summary of Transportation Information <br /> Existing Roadway Characteristics <br /> Affected Roadway Jones Ferry Road <br /> Type of Roadway Local Collector— 2 lane <br /> undivided <br /> Current Roadway 10,000 AADT <br /> Capacity <br /> Latest Traffic Volume 4,300 AADT <br /> Traffic Generation <br /> Number of Trips Expected to be Generated by <br /> Proposed Project Daily trips vary; 60 trips per event <br /> Proposed Utilities <br /> No utilities are proposed. An existing well is located on the parcel, outside of the designated SUP area. <br /> Erosion Control/Stormwater Regulations <br /> The applicant has indicated the project will conform to existing stormwater management (Section 6.14) and <br /> erosion and sedimentation control (Section 6.15) regulations of the UDO. A Preliminary Stormwater Impact <br /> Analysis was submitted and is contained in Attachment 1. Attachment 5 includes Development Advisory <br /> Committee comments from Orange County Erosion and Sedimentation Control and Stormwater <br /> Management staff. <br /> Land Use Buffers/Setbacks <br /> North 20 ft. setback, 30 ft. burial setback <br /> South 20 ft. setback, 30 ft. burial setback <br /> East 20 ft. setback, 30 ft. burial setback <br /> West 40 ft. setback, 30 ft. burial setback, 30 ft. Type B landscape buffer <br /> Environmental Assessment (EA) <br /> The applicant has provided an Environmental Assessment (EA) application and supporting materials as <br /> required in Section 6.16 of the UDO with their submittal. These materials have been shared with various <br /> State agencies via the NC Department of Administration's State Clearinghouse. Planning and DEAPR <br /> Staff have jointly reviewed the materials and agree with a determination of"Finding of No Significant <br /> Impact (FONSI)" as required in Section 2.25.1 (B) (5) of the LIDO (Attachment 5). This determination <br /> eliminates a requirement from the applicant to provide a more detailed Environmental Impact Statement <br /> (EIS) process as outlined in Sections 2.25.2 and 6.16.4 of the UDO. <br />