Orange County NC Website
73 <br /> • Performance requirements related to operational conditions such as noise, lighting, and <br /> air pollution; <br /> • Vehicular access and circulation. <br /> The drawings and other materials submitted with this application provide documentation of the <br /> project's compliance with applicable UDO performance criteria. <br /> (B)The development can reasonably be completed within the vesting period requested, if <br /> any. <br /> The Owner is prepared to begin construction work on the site within 12 months of SUP <br /> approval. <br /> (C) Where vesting in excess of two years is requested, the project is located in an area <br /> where current issues under study do not involve potential amendments to the <br /> Comprehensive Plan and/or this Ordinance. <br /> No vesting is being requested for this application in excess of two years. <br /> 4 <br />