Orange County NC Website
BOA Public Hearing Notices mailed by <br />staff on April 24, 2024. Certification <br />available in Attachment 4. <br />Sign Posting on Property (at <br />least 10 days prior) 2.7.6(A)(2) <br />NIM and BOA Materials (Attachments 3 <br />& 4) <br />NIM signs posted by staff on March 6, <br />2024 prior to March 17 NIM. Photo <br />documentation available in Attachment <br />4. <br />BOA signs posted by staff on April 25, <br />2024. Certification and photo <br />documentation available in Attachment <br />4. <br />7 <br />REQUIREMENT UDO SUPPORTING EVIDENCE FOF <br />Waste, Safety and Access Requirements for all SUPs <br />Waste Disposal <br />Method and adequacy of <br />provision for sewage disposal <br />facilities, solid waste and water <br />service. <br />5.3.2(B)(1) <br />Exhibit B – Narrative of Proposed <br />Modifications (Attachment 1) <br />[Both Environmental Health and Solid <br />Waste have indicated they have no <br />concerns with the proposed <br />modifications as there is no proposed <br />change to the land use, simply the <br />ownership and open space location.] <br />8 <br />Safety <br />Method and adequacy of <br />police, fire and rescue squad <br />protection. <br />5.3.2(B)(2) <br />Exhibit C-1 – Site Plan of the Application <br />(Attachment 1) <br />[Fire Marshal has indicated that they <br />have no concerns. Memo available in <br />Project Correspondence and DAC <br />Comments (Attachment 5).] <br />9 <br />Vehicle Access <br />Method and adequacy of <br />vehicle access to the site and <br />traffic conditions around the <br />site. <br />5.3.2(B)(3) <br />Exhibit C-1 – Site Plan of the Application <br />(Attachment 1) <br />[There is no proposed change to the site <br />access. No additional NCDOT driveway <br />permits are required as a result of the <br />proposed SUP modification.] <br />10 <br />261