Browse
Search
5.8.24 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2024
>
5.8.24 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 4:54:24 PM
Creation date
5/2/2024 4:33:16 PM
Metadata
Fields
Template:
BOCC
Date
5/8/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erosion & Sedimentation Control (E&SC): <br />No E&SC related materials were submitted with this Special Use Permit application. <br />According to current Orange County GIS imagery of the project parcel, there are mapped <br />stream features within the project parcel boundaries. Orange County enforces stream <br />buffers along streams, rivers, water bodies, and other water features (e.g., wetlands) as <br />outlined in Section 6.13 of the Orange County UDO. Based on the submitted materials <br />for the proposed development, the project could meet the basic Erosion and <br />Sedimentation Control requirements as required by Orange County UDO Section 6.15 <br />and could be developed as generally proposed. <br /> <br />Stormwater Management: <br />No stormwater management related materials were submitted with the Special Use <br />Permit application. The submitted materials indicate a level of development that could <br />meet current UDO requirements specific to stormwater management. The project will <br />need to meet applicable stormwater management requirements as outlined in Section <br />6.14 of the Orange County UDO and must be in general conformance with the North <br />Carolina Stormwater Design Manual (i.e., Minimum Design Criteria). <br /> <br />Conclusion: <br />The Division has No Objections to the approval of the SUP request so long as a complete <br />LDP application and supporting plans and calculations are submitted to Orange County <br />for review and approval prior to commencement of on-site Land-Disturbing Activity, if <br />thresholds were to be reached or exceeded with the proposed development . As the <br />project progresses, additional field observations, and/or permitting by others (e.g., US <br />Army Corps of Engineers, NC Department of Environmental Quality, NC Department of <br />Transportation, etc.), additional buffers, setbacks, and/or additional Orange County <br />review and permitting may apply beyond the proposed development as shown with this <br />SUP request. <br /> <br />___________________________ _______________ <br /> Christopher Sandt, PE Date <br /> <br /> 4/11/2024 <br />_________________________ _______________ <br /> Steve Kaltenbach Date <br /> <br />239
The URL can be used to link to this page
Your browser does not support the video tag.