Browse
Search
9.13.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
9.13.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 4:21:10 PM
Creation date
5/2/2024 2:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/13/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Estimated square footage of area to be graded for development of attached residential units <br /> (excluding roads, but including parking areas) <br /> 0 <br /> E. Estimated square footage of area to be graded for non-residential use (excluding roads) <br /> 4000 sf <br /> F. Estimated area to be graded for roads 1.6 AC <br /> ■ Road type: ❑ Public 8 Private <br /> ❑ Class A <br /> ❑ Class B <br /> ■ Total road length: 3,620 ft <br /> IIII. State Permits Required <br /> A. Does the project involve the mining of earth products? ❑ Yes 8 No <br /> ■ If yes, how many cubic feet of material are expected to be excavated? <br /> ■ Has an application for a Mining Permit been submitted to NCDRCD? ❑ Yes ❑ No <br /> Please attach map indicating expected extent of proposed activity. <br /> B. Does the project involve generation or storage of hazardous or toxic wastes, as identified by <br /> the Environmental Protection Agency? <br /> ❑ Yes 8 No <br /> ■ Describe the wastes to be generated: <br /> ■ How much material is expected to be generated per month? <br /> ■ Will any material be treated onsite? ❑ Yes ❑ No If yes, indicate volume: <br /> Will any material be stored onsite? ❑ Yes ❑ No If yes, indicate volume: <br /> ■ Where will disposal of the material take place? <br /> ■ How will materials be transported to the disposal site? <br /> ■ What measures are proposed to protect water quality and air quality in case of <br /> spills? <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.