Browse
Search
9.13.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
9.13.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 4:21:10 PM
Creation date
5/2/2024 2:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/13/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> GENERAL INFORMATION 187 <br /> ❑ PERMITS/AUTHORIZATIONS ARE SUBJECT TO REVOCATION IF THE SITE PLAN,PLAT,OR INTENDED USE <br /> CHANGES OR IF THE SITE IS ALTERED. SUBSEQUENT CHANGES TO THE SITE PLAN OR INFORMATION ON <br /> THE APPLICATION WILL REQUIRE A NEW APPLICATION AND ADDITIONAL FEES <br /> ❑ NO REFUNDS WILL BE GIVEN FOR SERVICES THAT ARE ALREADY RENDERED OR INITIATED. <br /> ❑ PAYMENT AS INDICATED IN THE INDTVTDUAL SECTIONS MUST ACCOMPANY THE APPLICATION IN ORDER TO <br /> PROCESS THE APPLICATION AND SCHEDULE A FIELD VISIT BY STAFF <br /> ❑ A WELL PERMIT OR A CONSTRUCTION AUTHORIZATION MUST BE ISSUED PRIOR TO ANY CONSTRUCTION OR <br /> REPAIR OF A WELL OR A WASTEWATER SYSTEM. <br /> ❑ A FINAL INSPECTION OF THE WELL AND WASTEWATER SYSTEM MUST BE COMPLETED AND APPROVED BY <br /> THE OCHD STAFF PRIOR TO PLACING EITHER INTO USE OR OCCUPYING A NEW HOME. <br /> ❑ YOU MUST CONTRACT WITH A WELL CONTRACTOR WHO IS REGISTERED IN ORANGE COUNTY AND HOLDS A <br /> VALID CERTIFICATION FROM THE STATE OF N.C. (A LIST IS AVAILABLE) <br /> ❑ YOU MUST CONTRACT WITH A SEPTIC CONTRACTOR WHO IS REGISTERED TO INSTALL OR REPAIR SYSTEMS <br /> IN ORANGE COUNTY. (A LIST IS AVAILABLE) <br /> ❑ EVERY APPLICATION FOR A CONSTRUCTION AUTHORIZATION MUST BE ACCOMPANIED BY EITHER A VALID <br /> IMPROVEMENT PERMIT OR BY AN APPLICATION FOR AN IMPROVEMENT PERMIT. <br /> ❑ ANY CHANGES THAT ARE PROPOSED FOR AN EXISTING PERMIT REQUIRES A NEW APPLICATION. <br /> El FOR AN IMPROVEMENT PERMIT,IF A HOUSE SITE OR PROPOSED SEPTIC SITE IS NOT DESIGNATED ON THE <br /> SITE PLAN,ONE WILL BE ASSIGNED BY THE OCHD STAFF. <br /> EXPIRATION OF PERMITS/AUTHORIZATIONS <br /> WELL PERMITS 5 YEARS I <br /> EXISTING WE.LIISYSTEM AUTHORIZATIONS 6 MONTHS <br /> IMPROVEMENT PERMITS 5 YEARS(WHEN A SITE PLAN IS SUBMITTED) <br /> NO EXPIRATION(WHEN PLAT*IS SUBMITTED) <br /> CONSTRUCTION AUTHORIZATIONS 5 YEARS MAXIMUM OR WHEN ACCOMPANYING <br /> IMPROVEMENT PERMIT EXPIRES WHICHEVER COMES <br /> FIRST. <br /> *Plat=prepared by a Registered Land Surveyor to a scale of P 60'showing the facility,appurtenances,site for the septic system,water supplies, <br /> and surface water. Or an approved and recorded subdivision plat accompanied by a site plats drawn to snle. <br /> NOTES: <br /> i <br /> l <br /> I <br /> �I <br /> M <br /> 1 ' <br /> t <br /> OCHD 09/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.