Browse
Search
9.13.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
9.13.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 4:21:10 PM
Creation date
5/2/2024 2:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/13/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> Ordinance Requirements <br /> "Camp" is defined as Use #32 in the Table of Permitted Uses and within Article 10 Definitions of the UDO <br /> as: <br /> "A recreation use which may include locations for tents, cabins, or other recreational sleeping <br /> structures, but would not include mobile homes. A camp may be owned by a profit or not-for profit <br /> corporation." <br /> "Retreat Center" is defined as Use#80 in the Table of Permitted Uses and within Article 10 Definitions of the <br /> UDO as: <br /> "An assembly land use operated as a commercial activity." <br /> Section 5.2.1 Table of Permitted Uses of the UDO lists Camps and Retreat Centers as a permitted use of <br /> property within the AR general use zoning district subject to the issuance of a SUP. <br /> Standards governing the development of a "Camp," as detailed in Section 5.7.5 of the UDO, are as follows: <br /> (1) Submittal Requirements. In addition to the information required by Section 2.7, #-A-.following <br /> shall be submitted as part of the application: <br /> (a) A site plan prepared in accordance with Section 2.5, also showing the following <br /> (existing or proposed): <br /> (i) Buildings; <br /> (ii) Campsites; <br /> (iii) Storage areas; <br /> (iv) Fencing and gates; <br /> (iv) Outdoor recreation areas; and <br /> (v) Access road(s) to the site, as well as on site roads, with an indication of type of <br /> proposed surface. <br /> STAFF COMMENT: A Site Plan has been submitted with this request providing required <br /> details. <br /> Please note, this is the required site plan denoting compliance with the UDO as it relates to <br /> the issuance of the SUP. A final site plan and Zoning Compliance Permit shall be required for <br /> review and approval by the County prior to the commencement of earth disturbing activities <br /> as required in Section 2.5: Site Plan Review of the UDO. Should the SUP be approved, the <br /> Planning Director may only approve minor modifications from the site plan provided with this <br /> application, as specified by Orange County UDO Section 2.7.14. <br /> The applicant has also included a detailed narrative providing additional information on the <br /> nature of the operations and activities envisioned for the property. <br /> (b) A description of the type of facility planned, the size, capacity, and use of proposed <br /> buildings; a signed statement from the owners or operators that there shall be no activity allowed <br /> that will have adverse effects on adjacent property. The statement shall also include a complete <br /> list of all recreational activities that will take place on the site. <br /> STAFF COMMENT: Provided within the Application Package (Attachment 2) as well as on <br /> the submitted site plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.