Orange County NC Website
99 <br /> 1. Demolition and/or Deconstruction Waste: <br /> Regulated Recyclable Materials (clean wood waste, scrap metal and corrugated cardboard) <br /> generated in Orange County must be recycled. During demolition activities, metal and wood are <br /> often not "reasonably possible to separate" or doing so may present health and safety concerns <br /> (asbestos, lead paint, etc.). In these cases only, are regulated materials not required to be separated <br /> for recycling. Consider whether the following materials will be generated on this project, in any puantitV, <br /> and indicate the management method(s). <br /> © Ordinance <br /> X No metal waste will be produced (proceed to # 2) <br /> Recycle at Orange County Landfill (no tip fee charged if kept separate) <br /> Segregated for hauling to scrap metal dealer <br /> Mixed with other waste and taken to Certified Commingled Recycling Facility <br /> 2. Clean Wood Wastes (Clean wood wastes are required by Ordinance to be recycled) <br /> X No clean wood wastes will be produced (proceed to # 3) <br /> Recycle at Orange County Landfill (reduced tip fee charged if kept separate) <br /> Separated for private salvage or charity <br /> Mixed with other waste and taken to Certified Commingled Recycling Facility <br /> © 3. Demolition or Deconstruction of Buildings and Structures on the Site <br /> No structure(s) will be removed (proceed to Construction Wastes section) <br /> Structure(s) must be demolished or relocated. Please describe (include square footage for <br /> each structure): A small well house structure with concrete walls (8,x6,) will be demolished <br /> Xd <br /> as part of the proposed project. Depending on reinforcing, the concrete <br /> may be re-purposed on site as landscaping features. <br /> If any structure described above is greater than 500 ft , it must be assessed for salvage and <br /> deconstruction possibilities. Please call Solid Waste Staff at (919) 968-2788 to arrange an <br /> assessment. <br /> Could the structure(s) be moved from the site? YES NO X <br /> Has the sale or donation of the structures been considered? <br /> Please explain: YES NO X <br /> Re-location of structure is not feasible. <br /> What is the timetable on removal of the structure(s)? <br /> If removed, this structure would be demolished during the land clearing phase of project <br /> pring 2024). <br /> Page 12 <br />