Orange County NC Website
43 <br /> 1 Patrick Byker: Unless the board has other ones to suggest,those are ones that we're prepared to agree to. <br /> 2 <br /> 3 Leon Meyers: On the lighting matter where the lighting study shows lighting levels beyond LIDO requirements, is it correct to say <br /> 4 that?Okay,then would you be willing to accept the condition that the final design maybe this is the right way to say this, the final <br /> 5 design will comply with UDO with respect to offsite lighting? <br /> 6 <br /> 7 Patrick Byker:Yes sir. <br /> 8 <br /> 9 Leon Meyers: Okay. Board members, did anybody have anything that Mr. Byker would need to have some input in before we <br /> 10 close the public hearing regarding conditions? <br /> 11 <br /> 12 Beth Bronson: I'm trying to clarify that Buffer Type C, is that a condition or is that a courtesy or? <br /> 13 <br /> 14 Will Wirt:Will Wirt with Summit Design Engineering, Buffer Type C? <br /> 15 <br /> 16 Beth Bronson:Yes. <br /> 17 <br /> 18 Will Wirt:Yeah,so the Buffer Type C is a plan commitment to supplement the existing vegetation within the perimeter buffer <br /> 19 around the site. Like all the perimeter buffers that, excuse me,the property line that adjoins residential properties to the north, <br /> 20 east, and south, and then along the tennis facilities' property line adjoining Lawrence Road. <br /> 21 <br /> 22 Taylor Perschau: The Type C,what they're offering is a little different than Type C. They're offering the landscaping,just the <br /> 23 planting part of it which is in addition to what's required. <br /> 24 <br /> 25 Beth Bronson: So it's going to be a Buffer Type B, but it is a planned commitment to use Type C landscaping? <br /> 26 <br /> 27 Taylor Perschau:Yes,the width is comparable to a Type B, the 30 foot width. Type C,the planting standard intensity of planting is <br /> 28 their commitment. <br /> 29 <br /> 30 Beth Bronson: Is going to be Type C. <br /> 31 <br /> 32 Taylor Perschau:Yes. <br /> 33 <br /> 34 Will Wirt:Yeah,the density of the plantings along that buffer. <br /> 35 <br /> 36 Leon Meyers: Is that clear on the site, any note on the site plan for placement Mr. Wirt? <br /> 37 <br /> 38 Will Wirt:1 believe it is on the landscape plan,yes sir. <br /> 39 <br /> 40 Leon Meyers: Could you point that out for us please? I just want to be sure if it needs to be a condition, let's get it in the condition <br /> 41 list. If it's not clear in the documents. <br /> 42 <br /> 43 Will Wirt: I can't remember the sheet labels off the top of my head. <br /> 44 <br /> 45 Taylor Perschau: The best way is going to be to pull it up online, but that's going to take a minute because— <br /> 46 <br /> 47 Will Wirt: Okay,so the landscape plan, landscape and tree protection should be C4 in the site plan. <br /> 48 <br /> 49 Beth Bronson: Page 467. 1 believe so. Is this for the revised plan from the 18th? <br /> 50 <br /> 51 Will Wirt: October 18,yes ma'am. <br /> 52 <br /> 53 Beth Bronson: Okay. So you're committing to, it looks like you're committing to option one mixed for Buffer Type C, but with a 30 <br /> 54 foot instead of 40 foot buffer to the adjoining properties. <br /> 55 <br />