Browse
Search
12.13.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
12.13.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 4:02:14 PM
Creation date
5/2/2024 2:40:31 PM
Metadata
Fields
Template:
BOCC
Date
12/13/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> 1 Lyle Overcash: Good evening. My name is Lyle Overcash. I'm with Kimley Horn and Associates,421 Fayetteville Street in <br /> 2 Raleigh,27601. 1 think Attachment 10 or one of the exhibits has my resume included. I've been employed at Kimley Horn <br /> 3 for about 3 years. And I've been a traffic engineer for about 30 years. I hold a Bachelor of Science from NC State <br /> 4 University from 1993 with specialty in transportation. I'm a member of the Institute of Transportation Engineers and I'm a <br /> 5 licensed professional engineer in North Carolina and Virginia. My firm prepared the traffic impact analysis, and 1 <br /> 6 supervised the TIA for the case before the Board tonight. We conducted a traffic study of this project which was completed <br /> 7 in July 2023. This study was conducted per the DOT and Orange County LIDO standards contained in Section 6.17 which <br /> 8 are based on the typical Institute of Transportation Engineers methods for conducting a traffic study. There's a map from <br /> 9 the TIA in front of you that shows the study intersections. They included, I don't think I can point, but they included US 70 <br /> 10 Alt at Lawrence Road, US 70 Alt at NC 86, US 70 at Lawrence Road, US 70 Alt at US 70 and the two site driveways on <br /> 11 Lawrence Road and US 70 Alt. We did not study the intersection of Lawrence Road and Old NC 10 for the following the <br /> 12 reasons. This was not one of the intersections that DOT required us to study in connection with the development of this <br /> 13 site. This is because we're not expected to have a significant impact on that intersection to warrant including it in the TIA. <br /> 14 It is my professional opinion that approximately 15 percent of the traffic from the proposed facilities will utilize the <br /> 15 intersection of Lawrence Road and Old NC 10. Regarding traffic generation,the study showed the project has a potential <br /> 16 to generate about 2,278 trips per day with about 117 in the AM peak in the morning, and 258 in the afternoon. Let's see. <br /> 17 And based on the review of the TIA by the DOT and the county, these are the recommended improvements. Construct a <br /> 18 southbound left-turn lane on Lawrence Road with a minimum of 150 feet of storage and transitions per DOT requirements. <br /> 19 Construct one ingress and two egress lanes on the site driveway on Lawrence Road. And provide a internal protected <br /> 20 ****about 100 feet internally. As we mentioned,the internal street system will be three-lane roads. And then on US 70 Alt <br /> 21 at Site Driveway 2 is a full movement driveway with one ingress and two egress lanes. Lastly, I want to point out the TIA <br /> 22 projected daily volumes for Lawrence Road and US 70 Alt to be well under capacity after build out of this project. As <br /> 23 shown in Table 7.1 in the TIA,future volumes on these adjacent roadways are projected to be in the range of 3 to 7,000 <br /> 24 vehicles per day while the capacity of these roadways are approximately 13 to 14,000 vehicles per day. In conclusion, it is <br /> 25 my professional opinion that a TI was performed in compliance with Section 6.1, 6.17 of the Orange County UDO and it is <br /> 26 my professional opinion that the vehicle access to the site and traffic conditions around the site are adequate per the <br /> 27 standards of the LIDO in Section 5.3.2 and will maintain public health and safety. It is my professional opinion that the plan <br /> 28 before you today provides mitigation for traffic congestion impacts reasonably expected to be generated by the recreational <br /> 29 facilities. And it is also my professional opinion that the site has been designed in an appropriate manner to safely <br /> 30 accommodate emergency vehicles. I'm available to answer any questions you may have. <br /> 31 <br /> 32 Leon Meyers:This is regarding traffic. <br /> 33 <br /> 34 Nathan Robinson: Mr. Overcash, I'm sure you heard the lady's statement earlier in the evening about that she had a <br /> 35 concern on 70. What is the signaling there on 70 where Lawrence Road hits 70? <br /> 36 <br /> 37 Lyle Overcash: I always thought the US 70 Alt and Lawrence Road we did a signal warrant analysis, and it does meet <br /> 38 signal warrants. And so therefore we recommended a signal, but in review in the TIA by the DOT, the DOT feels that the <br /> 39 all way stop is sufficient.And the increased the average increase and delay that we would experience at the all way stop <br /> 40 with the development is about 15 to 30 seconds on average for all the vehicles that enter the all way stop. So they feel like <br /> 41 for that little increase in delay that you know,signalization is not warranted, and they're happy with the all way stop <br /> 42 operation. <br /> 43 <br /> 44 Nathan Robinson: Do you know what the level of service is that they, do you know what the maximum level of service is <br /> 45 that they demand? Is it 30 seconds? I actually don't know. <br /> 46 <br /> 47 Lyle Overcash: In the TIA, the average delay will be around, I think 90 seconds the worst in the build condition. In the <br /> 48 morning it was 84 seconds average delay. <br /> 49 <br /> 50 Nathan Robinson:And what is it now? <br /> 51 <br /> 52 Lyle Overcash: In the background condition it would 68. So it would go from about 68 to 84, between background and build. <br /> 53 <br /> 54 Beth Bronson: Is that off of 70 or is that off of Lawrence? <br /> 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.