Orange County NC Website
BYDATEREVISIONS132456PROJECT NO. <br />SHEET NO.DRAWING ALTERATIONIT IS A VIOLATION OF LAW FOR ANY PERSON,UNLESS ACTING UNDER THE DIRECTION OFLICENSED ARCHITECT, PROFESSIONALENGINEER, LANDSCAPE ARCHITECT, ORLAND SURVEYOR TO ALTER ANY ITEM ONTHIS DOCUMENT IN ANY WAY. ANY LICENSEEWHO ALTERS THIS DOCUMENT IS REQUIREDBY LAW TO AFFIX HIS OR HER SEAL AND THENOTATION "ALTERED BY" FOLLOWED BY HISOR HER SIGNATURE AND SPECIFICDESCRIPTION OF THE ALTERATIONS.PROJECT ENGINEER/ARCHITECTPROJECT MANAGERDRAWN BY7DRAWING NAME:COPYRIGHT 2022SUMMIT DESIGN ANDENGINEERING SERVICESCWW (WILLIAM.WIRT@SUMMITDE.COM) 22-0214LAWRENCE ROAD DEVELOPMENT HILLSBOROUGH, NCPRELIMINARY PLANS FORFIRST ISSUE DATEMP (MICK.PARKER@SUMMITDE.COM)09-02-2022LAWRENCE ROADWW (WILLIAM.WIRT@SUMMITDE.COM)NOT FOR <br />CONSTRUCTION <br />22-0214_D.dwg <br />D-2 LIGHTING DETAILSPROPOSED FULLCUT OFF AREA LIGHT, MOUNTED ON 25' POLE. <br />SEE POLE BASE/FOUNDATION DETAIL ON THIS SHEET. <br />POLE MOUNTED PARKING LIGHT <br />25' HEIGHT FROM FINAL GRADE TO TOP <br />OF LIGHTING FIXTURE <br />45° <br />0 <br />' <br />0 <br />" <br />' <br />NOTES: <br />1. PRIOR TO POURING CONCRETE, INTERNAL STRUCTURE IS TO BE <br />INSPECTED BY A SDES REPRESENTATIVE. WITHOUT INSPECTION, <br />POLE BASE WILL BE REMOVED AND REINSTALLED. <br />2. FORM POLE BASE FOUNDATION USING CONCRETE FORM <br />EXTENDING FULL DEPTH OF BASE. SURFACE SHALL BE FREE OF <br />VOIDS AND BLEMISHES. <br />3. MEASUREMENTS ABOVE GRADE SHALL BE MADE WITH <br />REFERENCE TO THE HIGHEST POINT OF GRADE INTERSECTING <br />THE POLE BASE. <br />4. MEASUREMENTS BELOW GRADE SHALL BE MADE WITH <br />REFERENCE TO THE LOWEST POINT OF GRADE INTERSECTING <br />THE POLE BASE. <br />5. REMOVE AND DISPOSE ALL SURPLUS EARTH FROM POLE BASE <br />EXCAVATION AND BACK FILLING TO MAINTAIN THE <br />BASE-TO-GRADE DISTANCE WITHIN 12" AROUND THE BASE. <br />6. ANCHOR BOLTS AND POLE WIRING PER MANUFACTURE'S <br />RECOMMENDATIONS. <br />CONDUIT UP TO 3/4" Ø MAY BE IMBEDED FOR CONCEALED WIRING. <br />7. CENTER POLE ON CONCRETE BASE. BLOT PATTERN IS TO MATCH <br />POLE BASE. ORIENT POLE BASE SUCH THAT FLAT SIDE OF POLE <br />BASE IS PARALLEL TO CURB LINE; HAND HOLE SHOULD BE ON <br />OPPOSITE SIDE FROM PARKING AREA WHERE SUCH <br />ARRANGEMENT IS POSSIBLE. <br />POLE HT. <br />NOTES: <br />1. PRIOR TO POURING CONCRETE, INTERNAL STRUCTURE IS TO BE INSPECTED <br />BY A SDES REPRESENTATIVE. WITHOUT INSPECTION, POLE BASE WILL BE <br />REMOVED AND REINSTALLED. <br />2. FORM POLE BASE FOUNDATION USING CONCRETE FORM EXTENDING FULL <br />DEPTH OF BASE. SURFACE SHALL BE FREE OF VOIDS AND BLEMISHES. <br />3. MEASUREMENTS ABOVE GRADE SHALL BE MADE WITH REFERENCE TO THE <br />HIGHEST POINT OF GRADE INTERSECTING THE POLE BASE. <br />4. MEASUREMENTS BELOW GRADE SHALL BE MADE WITH REFERENCE TO THE <br />LOWEST POINT OF GRADE INTERSECTING THE POLE BASE. <br />5. REMOVE AND DISPOSE ALL SURPLUS EARTH FROM POLE BASE EXCAVATION <br />AND BACK FILLING TO MAINTAIN THE BASE-TO-GRADE DISTANCE WITHIN 12" <br />AROUND THE BASE. <br />6. ANCHOR BOLTS AND POLE WIRING PER MANUFACTURE'S <br />RECOMMENDATIONS. <br />CONDUIT UP TO 3/4" Ø MAY BE IMBEDED FOR CONCEALED WIRING. <br />7. CENTER POLE ON CONCRETE BASE. BLOT PATTERN IS TO MATCH POLE <br />BASE. ORIENT POLE BASE SUCH THAT FLAT SIDE OF POLE BASE IS <br />PARALLEL TO CURB LINE; HAND HOLE SHOULD BE ON OPPOSITE SIDE FROM <br />PARKING AREA WHERE SUCH ARRANGEMENT IS POSSIBLE. <br />8. ALLOW CONCRETE TO CURE FOR A MINIMUM OF 30 DAYS PRIOR TO <br />INSTALLING POLE. <br />15' POLE <br />25' POLE <br />Ø D V <br />16" 5'-0" #6 <br />18" 6'-6" #7 <br />Ø <br />D <br />A A <br />POLE <br />HAND HOLE <br />ANCHOR BOLTS (4) <br />FURNISHED W/ POLE <br />FINISHED GRADE <br />LIGHT POLE FOUNDATION DETAIL <br />NTS <br />SECTION A-A <br />1" CONDUIT <br />STUBBED ABOVE <br />CONCRETE BASE <br />#4 TIES @ 1' O.C. <br />Ø MIN.3" COVER <br />ALL SIDES (TYP) <br />3" MIN. <br />1" CHAMFER <br />COVER PER LIGHT <br />POLE MANUAL <br />4 - VERTICAL <br />REBAR, SIZE <br />"V" <br />30" <br />MIN <br />24" <br />MIN <br />3,000 PSI <br />CONCRETE <br />GROUND WIRE PER <br />MANUFACTURE <br />3/4" CONDUIT <br />STUBBED ABOVE <br />CONCRETE BASE <br />GROUND ROD <br />GENERAL LIGHTING NOTES: <br />1. OWNER WILL MAINTAIN PROPOSED EXTERIOR PARKING LOT LIGHTING AND BUILDING MOUNTED <br />LIGHTS. FIXTURES WILL BE INSPECTED SEMI-ANNUALLY AND BULBS WILL BE REPLACED AS NEEDED. <br />2. CONTRACTOR SHALL INSTALL PARKING LOT LIGHTING FIXTURES AT 25' HEIGHT. <br />3. CONTRACTOR SHALL COORDINATE WITH PME PLANS AND PME ENGINEER FOR ELECTRIC FEED <br />SERVICE LOCATIONS SO THAT NECESSARY CONDUIT FOR LIGHT POLES CAN BE INSTALLED PRIOR TO <br />PAVING OPERATIONS. <br />4. THE LENSES IN THE LIGHT FIXTURES SHALL NOT DROP BELOW THE LIGHT FIXTURE HOUSING. <br />5. EXTERIOR LIGHTS TO OPERATE AS REQUIRED DURING BUSINESS HOURS. <br />6. LIGHT POLE BASES ADJACENT TO PARKING STALLS ARE TO BE SITUATED WITH A MINIMUM CLEARANCE <br />OF 30” FROM BACK OF CURB. CONTACT ENGINEER FOR ALTERNATIVE SHOULD THIS REQUIREMENT <br />CAUSE A CONFLICT. <br />ACTUAL FIELD CONDITIONS WILL IMPACT LIGHTING INTENSITIES AND FIELD ADJUSTMENTS MAY BE <br />NEEDED TO HEAD/LENSE ANGLE AND WATTAGE TO INCREASE / DECREASE LIGHTING LEVELS TO <br />MEET THE REQUIRED INTENSITIES. <br />Material Submitted Into Evidence During 10-18-2023 Evidentiary Hearing