Orange County NC Website
5 <br /> Basic Review Process: A Special Use Permit application requires submission of a site plan and <br /> other documents, in accordance with Section 2.7.3 of the UDO: <br /> • FIRST ACTION — Staff Review/Analysis Begins <br /> STAFF COMMENT: An analysis of the application was made by qualified <br /> representatives of the County and other agencies or officials. <br /> • SECOND ACTION —Applicant holds a Neighborhood Information Meeting (NIM). <br /> STAFF COMMENT: The Neighborhood Information Meeting was held on August <br /> 15, 2023 at 6:00 p.m. at Orange County Public Library, 137 W. Margaret Lane, <br /> Hillsborough, NC. The applicant elected to hold an additional Neighborhood <br /> Information Meeting on October 5, 2023 at 6:00 p.m., which was also held at the <br /> Orange County Public Library, 137 W. Margaret Lane, Hillsborough, NC. <br /> Summary meeting materials are contained in Attachment 3. <br /> • THIRD ACTION — Development Advisory Committee Review/Analysis Begins <br /> STAFF COMMENT: The Orange County Development Advisory Committee met <br /> on August 17, 2023, and September 7, 2023 to review this application. The DAC <br /> has no objections to the approval of the Special Use Permit so long as the items <br /> in the attached departmental memos (Attachment 5) are addressed. <br /> • FOURTH ACTION — The BOA holds a quasi-judicial hearing, hears factual evidence <br /> and sworn testimony presented at an evidentiary hearing, and then makes a <br /> determination with findings of fact supported by competent, substantial, and material <br /> evidence. <br /> STAFF COMMENT: The evidentiary hearing is anticipated to be held on October <br /> 18, 2023. <br /> A formal application is required as part of a Special Use Permit request and has been submitted <br /> (Attachment 1). Approval of the application is part of the Special Use Permit process and shall <br /> include making appropriate findings of fact stating that the Board concludes all applicable <br /> standards have been met. <br /> Public Notification(s): In accordance with Section 2.7.6 of the UDO, notices of the Evidentiary <br /> Hearing were mailed via first class mail to all adjacent property owners of the subject parcel. <br /> These notices were mailed on October 3, 2023, 15 days before the meeting. Staff also posted <br /> the property with signs on October 4, 2023, 14 days before the meeting. See Attachment 4 for <br /> the notification materials. <br /> Planning Director's Comments: The Planning Director has determined the application is <br /> consistent with established submittal requirements, and there is sufficient documentation <br /> demonstrating general compliance with established development standards as detailed in Section <br /> 5.7.2 of the UDO; <br /> Staff does not make a formal recommendation on the approval of the application or on the <br /> compliance of the project with the general standards in Section 5.3.2(A)(2). The Board of <br /> Adjustment must determine if: <br /> (a) The use will maintain or promote the public health, safety and general welfare, if located <br /> where proposed and developed and operated according to the plan as submitted; <br />