Orange County NC Website
452 <br /> Method and adequacy of police, Fire Marshal has indicated that they <br /> fire and rescue squad have no concerns. Memo available in <br /> protection. Project Correspondence and DAC <br /> Comments (Attachment 5) <br /> The submitted site plan shows access <br /> Vehicle Access points. (Attachment 1) <br /> Method and adequacy of vehicle 5.3.2(B)(3) NCDOT District Office has indicated that 14 <br /> access to the site and traffic they have no concerns. Memo available <br /> conditions around the site. in Project Correspondence and DAC <br /> Comments. (Attachment 5) <br /> REQUIREMENT UDO SUPPORTING EVIDENCE FOF <br /> Standards Specific to this Use: RECREATIONAL FACILITIES <br /> Site Plan <br /> A site plan prepared in 2.5; and <br /> accordance with Section 2.5 Application (Attachment 1, Site Plan <br /> Sheet C-3 1,2 <br /> Site Plan Review and Section 5.7.2(C)(1) ) <br /> 5.7.2 Standards for <br /> Recreational Facilities <br /> Standards of Evaluation Application (Attachment 1, Site Plan <br /> The minimum lot size shall be 5.7.2(A)(2) Sheet C-3) 15 <br /> two acres. Lot 1 is 17.31 acres, Lot 2 is 36.08 acres <br /> Application (Attachment 1, Site Plan <br /> Facilities may include such Sheet C-3) <br /> features as play and training <br /> areas, athletic field lights, Facilities include indoor and outdoor <br /> public address systems, 5.7.2(A)(2) recreation areas, office/storage space, 16 <br /> parking for patrons and staff, and parking that exceed minimum <br /> storage/office facilities, and requirements. Lot 2 also features <br /> restroom/locker facilities. outdoor concession and restroom <br /> facilities. <br /> Application (Attachment 1, Site Plan <br /> No building shall be closer than Sheet C-3) <br /> 20 feet from any right-of-way or <br /> property line or the minimum 5.7.2(A)(2) The site design proposes a 30' 17 <br /> requirements of the district in development perimeter buffer and no <br /> which it is located. structures are proposed to be within that <br /> buffer. <br /> Outdoor athletic fields shall 5 7 2(A)(2) Application (Attachment 1, Site Plan 18 <br /> comply with the provisions of Sheet C-3) <br />