Browse
Search
11.15.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
11.15.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 3:31:29 PM
Creation date
5/2/2024 2:17:03 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
428 <br /> traffic to ensure acceptable operation. Additional improvements may be warranted and <br /> required at such time as Lot A is developed based on additional assessment. <br /> Lawrence Road and Proposed Site Access <br /> • Construct an exclusive southbound left turn lane on Lawrence Road with a <br /> minimum of 150' of full storage and appropriate transitions per NCDOT <br /> requirements. <br /> • Provide a full-movement, stop controlled access with a three-lane cross section on <br /> the site driveway consisting of one ingress lane and two egress lanes consisting of <br /> an exclusive right turn lane and an exclusive left turn lane with 100' of full <br /> storage and appropriate transitions <br /> • Provide a minimum internal protected stem length of 100' <br /> U.S. 70A and Proposed Site Access <br /> • Provide a full movement, stop controlled access with a three-lane cross section on <br /> the site driveway consisting of one ingress lane and two egress lanes consisting of <br /> an exclusive right turn lane and an exclusive left turn lane with 100' of full <br /> storage and appropriate transitions <br /> • Provide a minimum internal protected stem length of 100' <br /> Multi-modal and Streetscaue Enhancements: <br /> Any locally stipulated multi-modal enhancements including but not limited to sidewalk, <br /> bike lanes,bus pull offs, lighting, landscaping etc. on State maintained routes are subject <br /> to NCDOT requirements and approval through the encroachment process. <br /> General Requirements: <br /> It is necessary to obtain an approved driveway permit and/or encroachment agreement(s) <br /> prior to performing work on the NCDOT right of way. As a condition of the permit, the <br /> permitee shall be responsible for design and construction of the above stipulated <br /> improvements in accordance with NCDOT requirements. An approved permit will be <br /> issued upon receipt of approved site plan, roadway and plans, inspection fee, and any <br /> necessary performance and indemnity bonds. <br /> The applicant shall dedicate any additional right of way necessary to accommodate the <br /> required road improvements or future improvements as stipulated. <br /> Intersection radii and geometry shall be designed to accommodate turning movements of <br /> the largest anticipated vehicle. <br /> All pavement markings shall be long life thermoplastic. Pavement markers shall be <br /> installed if they previously existed on the roadway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.