Orange County NC Website
41 <br /> LIST OF TABLES <br /> Table No. Title Page No. <br /> Table 3.1 Traffic Generation................................................................................6 <br /> Table 6.0 Level-of-Service Control Delay Thresholds........................................ 15 <br /> Table 6.1 Level-of-Service: US 70 Alt. at Lawrence Road................................. 16 <br /> Table 6.2 Level-of-Service: US 70 Alt. at NC 86................................................ 17 <br /> Table 6.3 Level-of-Service: US 70 at Lawrence Road....................................... 18 <br /> Table 6.4 Level-of-Service: US 70 at US 70 Alt................................................. 19 <br /> Table 6.5 Level-of-Service: Lawrence Road at Site Driveway 1 ........................20 <br /> Table 6.6 Level-of-Service: US 70 Alt. at Site Driveway 2.................................21 <br /> Table 7.0 Total Development Traffic Generation ...............................................22 <br /> Table 7.1 AADT and Segmental LOS................................................................22 <br /> Table 9.1 Traffic Signal Warrants Summary......................................................24 <br /> LIST OF FIGURES <br /> Figure No. Title Page No. <br /> Figure 2.1 Site Location .......................................................................................3 <br /> Figure 2.2 Conceptual Site Plan...........................................................................4 <br /> Figure 2.3 Existing Roadway Laneage.................................................................5 <br /> Figure 4.1 Site Traffic Distribution and Percent Assignment— <br /> Recreational Center ............................................................................8 <br /> Figure 4.2 Site Traffic Distribution and Percent Assignment— <br /> Outdoor Recreational Area..................................................................9 <br /> Figure 5.1 Existing and Projected Background (2025) AM Peak Hour <br /> TrafficVolumes ................................................................................. 11 <br /> Figure 5.2 Existing and Projected Background (2025) PM Peak Hour <br /> TrafficVolumes ................................................................................. 12 <br /> Figure 5.3 Projected Build-out (2025) AM Peak Hour Traffic Volumes................ 13 <br /> Figure 5.4 Projected Build-out (2025) PM Peak Hour Traffic Volumes................ 14 <br /> Figure 11.1 Recommended Roadway Laneage....................................................28 <br />