Orange County NC Website
426 <br /> The times of operation have been revised to simply state hours of operation are Sam-lOpm 7 days a <br /> week. <br /> 4. Please add a note that addresses UDO Section 5.7.2(A)(6): "All outdoor recreational facilities shall <br /> utilize a combination of screens, fences, nets, berms, or vegetation to keep equipment on the property." <br /> If this detail is found elsewhere in the application, let me know so I can appropriately account for it. <br /> This note has been added to the cover sheet as note#15 <br /> September 22nd 2023 <br /> 1. Sheet C-5 Lighting Plan says "See Separate Lighting Plan for Baseball"but I'm not seeing a separate sheet <br /> in the latest and it looks like Lot 2 is displaying some lighting calculations in various places across the fields. <br /> This sheet has been added to the set. <br /> 2. Sheet C-4 details a Type C, 40'buffer while also detailing a 30' development perimeter buffer. It's not clear <br /> to me the intended difference between the Type C and "development perimeter buffer." Was that an <br /> intended distinction or which one is to be understood at the proposed landscaping buffer? <br /> Please specify where 40' is shown. A 30' development perimeter buffer is proposed around the site to <br /> increase the opacity between the subject and neighboring properties. "Type C" refers to the <br /> requirements of supplementation of the existing woody vegetation within the buffer to remain. <br /> Thank y u, <br /> William Wirt, PE <br /> 0 2 <br />