Browse
Search
11.15.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
11.15.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 3:31:29 PM
Creation date
5/2/2024 2:17:03 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
421 <br /> USUMMITDESIGN AND ENGINEERING SERVICES <br /> Taylor Perschau September 14, 2023 <br /> Planning and Zoning Supervisor <br /> Orange County Planning&Inspections Department <br /> Ms. Perschau, <br /> Please see the responses below to the comments you provided on the Lawrence Road Development project on <br /> September 05, 2023. The responses provided in this letter are numbered to match the comments that they address. <br /> The original comments are attached below. <br /> Environmental Health Comments: <br /> 1. No applications have been received for septic, well, or food service. <br /> Correct. Application will be submitted with Construction Drawings. <br /> Fire and Life Safety Comments: <br /> 1. Flow will have to be met for each building. <br /> Noted. <br /> 2. Fire apparatus access will have to be provided 360 degrees around all buildings. <br /> Noted. See note#10 on the cover sheet. <br /> 3. There may need to be designed fire lands depending on the location of hydrants and FDC. <br /> Noted. <br /> 4. All applicable fire permits will have to be applied for separately via the permitting portal to the Fire&Life <br /> Safety Division. These may be in addition to the Building Permits. <br /> Noted. <br /> Building inspections Comments: <br /> 1. All applicable permits are to be issued prior to construction activities. <br /> Noted. <br /> 2. Please note that ADA parking must be provided for all separate parking areas. <br /> Noted. The site will comply with all ADA parking standards, sample parking details have been <br /> provided on the cover sheet. <br /> Headquarters Office <br /> 320 Executive Court, Hillsborough, NC 21218 919.732.3883 // www.summitde.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.