Browse
Search
11.15.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
11.15.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 3:31:29 PM
Creation date
5/2/2024 2:17:03 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
418 <br /> Plan review: <br /> 1. Please have applicant stake out the driveway locations. Once staked please reach out to me so that I can <br /> conduct a field investigation. <br /> Driveway staking has been requested. Summit will advise when stakes are in place for field <br /> investigation. <br /> 2. Will Orange County require sidewalk. If so, preference would be for the sidewalk to be located outside the <br /> right of way in a public easement. <br /> Yes. All sidewalk is outside the NCDOT right-of-way. <br /> 3. Plans indicate septic fields for sewer/wastewater. How will the site receive water?Well or Town of <br /> Hillsborough? <br /> Wells will provide water for both parcels included in this SUP, Town of Hillsborough will not be <br /> providing water. <br /> 4. Additional design detail is needed for driveway accesses and road widening for improvements. <br /> Noted. Additional design will be provided to DOT as part of the permitting approval process. <br /> 5. Please provide 1OX70 sight distance triangles. Plantings and signs are to be located outside of sight distance <br /> triangles. <br /> Sight distance triangles have been added to the site and landscaping plans. <br /> OC Legal Comments <br /> No comments <br /> OC Transportation Services Comments: <br /> 1. Please label proposed sidewalks <br /> Sidewalks have been labeled on the site plan. <br /> 2. Staff recommends the development include bike, pedestrian, and transit considerations. <br /> Noted. Bike transit considerations may be evaluated with construction drawings, considerations have <br /> not been provided with this SUP. Sidewalk has been provided for pedestrian transit. <br /> Planning Comments: <br /> 1. It is advisable to establish standard hours of operation for the facilities as part of the SUP application <br /> narrative. Lighting hours are addressed in narrative; overall facility operation hours should be addressed <br /> prior to BOA review. <br /> Standard hours of operation for the facilities shall be Sam— IOpm, 7 days a week. Play will stop at 9pm <br /> for cleanup and maintenance. This has been added to the Cover sheet under Site information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.