Browse
Search
11.15.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
11.15.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 3:31:29 PM
Creation date
5/2/2024 2:17:03 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
416 <br /> UDO Section 6.15 and could be developed as generally proposed. The proposal will also <br /> require an Army Corps PCN 404/401 application for both the wetland impact and stream <br /> buffer impact and issuance of Orange County buffer impact authorization certificate for <br /> the planned stream crossing. <br /> Stormwater Management: <br /> The submitted materials indicate a level of development that could meet current UDO <br /> requirements specific to stormwater management. Two (2) permanent Stormwater <br /> Control Measures (SCMs) are proposed; specifically, two (2) permanent "wet ponds". <br /> Only the general locations and preliminary calculations for the proposed SCMs have been <br /> provided. The project will need to meet applicable stormwater management requirements <br /> as outlined in Section 6.14 of the Orange County UDO and must be in general <br /> conformance with the North Carolina Stormwater Design Manual (i.e., Minimum Design <br /> Criteria). <br /> Conclusion: <br /> The Division has No Objections to the approval of the SUP request so long as a complete <br /> LDP application and supporting plans and calculations are submitted for review, <br /> processing, and approval prior to commencement of on-site Land-Disturbing Activity. As <br /> the project progresses, additional field observations, and/or permitting by others (e.g. US <br /> Army Corps of Engineers, NC Department of Environmental Quality, NC Department of <br /> Transportation, etc.), additional buffers, setbacks, and/or additional Orange County <br /> review and permitting may apply beyond the proposed development as shown with this <br /> SUP request. <br /> Christopher Sandt, PE Date <br /> Steve Kaltenbach Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.