Orange County NC Website
416 <br /> UDO Section 6.15 and could be developed as generally proposed. The proposal will also <br /> require an Army Corps PCN 404/401 application for both the wetland impact and stream <br /> buffer impact and issuance of Orange County buffer impact authorization certificate for <br /> the planned stream crossing. <br /> Stormwater Management: <br /> The submitted materials indicate a level of development that could meet current UDO <br /> requirements specific to stormwater management. Two (2) permanent Stormwater <br /> Control Measures (SCMs) are proposed; specifically, two (2) permanent "wet ponds". <br /> Only the general locations and preliminary calculations for the proposed SCMs have been <br /> provided. The project will need to meet applicable stormwater management requirements <br /> as outlined in Section 6.14 of the Orange County UDO and must be in general <br /> conformance with the North Carolina Stormwater Design Manual (i.e., Minimum Design <br /> Criteria). <br /> Conclusion: <br /> The Division has No Objections to the approval of the SUP request so long as a complete <br /> LDP application and supporting plans and calculations are submitted for review, <br /> processing, and approval prior to commencement of on-site Land-Disturbing Activity. As <br /> the project progresses, additional field observations, and/or permitting by others (e.g. US <br /> Army Corps of Engineers, NC Department of Environmental Quality, NC Department of <br /> Transportation, etc.), additional buffers, setbacks, and/or additional Orange County <br /> review and permitting may apply beyond the proposed development as shown with this <br /> SUP request. <br /> Christopher Sandt, PE Date <br /> Steve Kaltenbach Date <br />