Browse
Search
11.15.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
11.15.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 3:31:29 PM
Creation date
5/2/2024 2:17:03 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> Attachment 1 <br /> Exhibit D — Proposed Findings of Fact <br /> The Applicant shall be required to provide the proposed findings of fact for the project based on the <br /> specific development standards for a proposed land use as detailed in Article 5 of the UDO as well as <br /> the qe eral findings as contained in Section 5.3.2 of the UDO: <br /> UDO SUPPORTING <br /> # REQUIREMENT Section EVIDENCE Condition # <br /> _ & lFinding of Fact) <br /> Application Components and Required Submittal Information: <br /> 1. Proper forms 12.2 Provided <br /> 2. Fees paid 2.2.4(D) At time of application <br /> Full description of use Included in the <br /> 3. ■ Location 2.7.3(B)( )1 site plan and <br /> ■ Appearance Exhibit B of this <br /> ■ Operational characteristics application <br /> 4. Owner Information 2.7.3(B)(2) Exhibit A of this application <br /> 5. Information needed for Use 2 7 3(B)(3) Included in Site plan <br /> Standards <br /> 6. Site Plans 2.7.3(B)(4) Submitted with this application <br /> 7. List of parcels within 1,000 feet 2.7.3(B)(5) Submitted with this applicatio <br /> 8. Elevations of all structures 2.7.3(13)(6) Submitted with this applicatio <br /> 9. EIS)Environmental Assessment (or 2.7.3(B)(7) Submitted with this application <br /> 10. Method of Debris Disposal 2.7.3(B)(8) Submitted with this applicatio <br /> 11. Development Schedule 2,7.3(13)(9) Exhibit G of this application <br /> 12. Extended Vesting Request 2.7.3(B)(10) Exhibit I of this application <br /> Notification Requirements: <br /> Public Notice 2.7.6(A) <br /> Date This shall occur after the <br /> 13. filing of the application <br /> a Time <br /> IN Place <br /> 14. Sign Posting on Property (at least 2.7.6(A)(2) This shall occur after the <br /> 10 daysprior) filing of the application <br /> Mailed Notice 2.7.6(A)(1) <br /> ■ Certified mail This shall occur after the <br /> filing of the application <br /> 15. ■ All adjacent property owners <br /> (within 1,000 feet) <br /> ■ Not less than fifteen days prior <br /> Specific Standards: <br /> Waste Disposal 5.3.2(B)(1) Testimony shall be provided <br /> 16. Method and adequacy of provision at hearing confirming this <br /> for sewage disposal facilities, solid <br /> waste and water service. <br /> Safety 5.3.2(B)(2) Testimony shall be <br /> 17. Method and adequacy of police, fire provided at hearing <br /> and rescue squad protection._ confirming this <br /> Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.