Browse
Search
11.15.23 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2023
>
11.15.23 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 3:31:29 PM
Creation date
5/2/2024 2:17:03 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lawrence Road Development Build-out(202WPM <br /> 1: Lawrence Road & US 70A * I 07/13/2023 <br /> -1, --1. "t I i <br /> Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations +T+ +T+ +T+ +T+ <br /> Traffic Volume(vph) 134 186 173 55 138 17 151 310 41 17 145 69 <br /> Future Volume(vph) 134 186 173 55 138 17 151 310 41 17 145 69 <br /> Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br /> Lane Width(ft) 12 12 12 12 12 12 12 12 12 12 12 12 <br /> Grade(%) 0% 0% 0% 0% <br /> Storage Length(ft) 0 0 0 0 0 0 0 0 <br /> Storage Lanes 0 0 0 0 0 0 0 0 <br /> Taper Length(ft) 25 25 25 25 <br /> Satd.Flow(prot) 0 1752 0 0 1795 0 0 1809 0 0 1770 0 <br /> Flt Permitted 0.847 0.800 0.822 0.946 <br /> Said.Flow(perm) 0 1504 0 0 1455 0 0 1510 0 0 1681 0 <br /> Right Turn on Red Yes Yes Yes Yes <br /> Satd.Flow(RTOR) 56 9 9 44 <br /> Link Speed(mph) 40 40 45 45 <br /> Link Distance(ft) 6421 1447 987 3451 <br /> Travel Time(s) 109.4 24.7 15.0 52.3 <br /> Confl.Peds.(#/hr) <br /> Confl.Bikes(#/hr) <br /> Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br /> Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% <br /> Heavy Vehicles(%) 2% 2% 2% 2°/q& 4% 2% 3% 2% 2% 2% 3% 2% <br /> Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Parking (#/hr) <br /> Mid-Block Traffic(%) 0% 0% 0% 0% <br /> Shared Lane Traffic(%) <br /> Lane Group Flow(vph) 0 519 0 0 221 0 0 528 0 0 244 0 <br /> Turn Type Perm NA Perm NA Perm NA <br /> Protected Phases 2 6 4 8 <br /> Permitted Phases 6 4 8 <br /> Detector Phase 2 2 6 6 4 4 8 8 <br /> Switch Phase <br /> Minimum Initial(s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 <br /> Minimum Split(s) 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 <br /> Total Split(s) 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 <br /> Total Split(%) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% <br /> Yellow Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 <br /> All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 <br /> Lost Time Adjust(s) -2.0 -2.0 -2.0 -2.0 <br /> Total Lost Time(s) 5.0 5.0 5.0 5.0 <br /> Lead/Lag <br /> Lead-Lag Optimize? <br /> Recall Mode None None Min Min None None Min Min <br /> Act Effct Green(s) 22.3 22.3 23.2 23.2 <br /> Actuated g/C Ratio 0.40 0.40 0.42 0.42 <br /> v/c Ratio 0.82 0.38 0.83 0.34 <br /> Control Delay 26.4 13.8 29.4 11.0 <br /> Queue Delay 0.0 0.0 0.0 0.0 <br /> Total Delay 26.4 13.8 29.4 11.0 <br /> LOS C B C B <br /> Approach Delay 26.4 13.8 29.4 11.0 <br /> Approach LOS C B C B <br /> Queue Length 50th(ft) 139 50 160 46 <br /> Queue Length 95th(ft) #298 97 #329 91 <br /> Internal Link Dist(ft) 6341 1367 907 3371 <br /> Turn Bay Length(ft) - <br /> Base Capacity(vph) 718 670 696 793 <br /> Starvation Cap Reductn 0 0 0 0 <br /> Spillback Cap Reductn 0 0 0 0 <br /> Storage Cap Reductn 0 0 0 <br /> Reduced v/c Ratio 0.72 0.33 0.76 0.31 <br /> Intersection Summary j <br /> Area Type: Other <br /> Cycle Length:60 <br /> Actuated Cycle Length:55.7 <br /> K:1RAL_TPT01_Traffic1014251006 RTP High SchoollT8-Recreation Only RevisionlT4-AnalysislSynchrolBuild-out(2025)-Improved.syn <br /> Kimley-Horn Synchro 11 Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.