Orange County NC Website
Lawrence Road Development Existing (2021'D AM <br /> 2: NC 86/Elizabeth Brady Road & US 70A 07/13/2023 <br /> Natural Cycle:60 <br /> Control Type:Actuated-Uncoordinated <br /> Maximum v/c Ratio:0.50 <br /> Intersection Signal Delay:11.8 Intersection LOS:B <br /> Intersection Capacity Utilization 56.7% ICU Level of Service B <br /> Analysis Period(min)15 <br /> Splits and Phases: 2:NC 86/Elizabeth Brady Road&US 70A <br /> 2 1 _ �o4 <br /> 205 20s <br /> 4- <br /> !no Sv. <br /> K:1RAL_TPT01_Traffic1014251006 RTP High School\T8-Recreation Only RevisionlT4-AnalysislSynchrolExisting(2022).syn <br /> Kimley-Horn Synchro 11 Report <br />