Orange County NC Website
40 <br /> Appendix 6. School Construction Project Components <br /> • Purchase and contracted pricing of property <br /> • <br /> Site Acquisition—Tasks and Survey <br /> costs associated with acquiring Deed recording <br /> a site Appraisals <br /> • Soils, environmental, suitability testing <br /> • Legal fees associated with purchase and recording <br /> • Pre-grading <br /> • Grading to include playing fields and playgrounds <br /> Hard Construction —Site & Installation of storm water run-off drainage <br /> Vertical Tasks and costs of Soil suitability testing (rock) <br /> "horizontal" and "vertical" Utility extension/installation <br /> construction: all construction 0 Sidewalks <br /> activities for the actual site * Turn lanes <br /> and building 9 Building Structure and Systems (includes General <br /> Contractor and all Sub-Contractors <br /> • Municipal Requirements <br /> • Landscaping <br /> Hard Construction—Off- <br /> Site 0 Off-site Traffic Improvements <br /> Tasks and costs of 0 Water and Sewer Service to the Site <br /> "horizontal" construction: all 9 Off-Site Environmental Mitigation <br /> construction activities for the 9 Trails and Greenway System <br /> surrounding area, not 0 Related Design <br /> including the building and <br /> direct site <br /> 0 Prime Construction Contracts (includes general <br /> Construction Costs— contractor, electrical contractor, HVAC contractor, <br /> Costs of constructing a new plumbing contractor) <br /> facility or renovating an * Other construction related work <br /> existing one 9 Sprinkler <br /> 9 Expanded Water Flows <br />