Orange County NC Website
32 <br /> iii) Installing covered walkways at student drop-off areas, main entrances and <br /> bus loading areas <br /> iv) Reducing student drop-off lanes <br /> It is also important to note that the cost of the regulatory process has historically <br /> been high and require from 12 to 24 months before the construction project can <br /> begin. <br /> 19 <br />