Agenda 05-07-24; 7-a - Discussion on Statutes and Policies Regarding Project-Based School Capital Funding
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 7-a - Discussion on Statutes and Policies Regarding Project-Based School Capital Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:49:32 PM
Creation date
5/2/2024 2:12:17 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 05-07-2024 Business Meeting
Minutes 05-07-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-028-Introduction of Bond order authorizing 300 mullion general obligation school bonds subject to voter approval first reading and scheduling of a related public hearing
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-006-Older Americans Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-007-Apraxia Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-021-Resolution supporting an application to the Local Government Commission for its approval of a County Financing Agreement
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-022-Resolution setting public hearing and authorizing filing of debt statements
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-023-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-024-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-025-Resolution Supporting the America 250 NC Program and Committee
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 <br /> archeological, environmental, suitability, and legal fees associated with purchase <br /> and recording the property. <br /> For purposes of this update, it is recommended that the per acre price be <br /> consistent with the fair market value of land at the time of purchase. The School <br /> Capital Review Team would review market value of land each year during the <br /> process outlined earlier in this report. <br /> b) Site Development <br /> Site development should be broken out into two sub-categories: <br /> i) Hard Construction —Site &Vertical Tasks <br /> Costs included in this category cover the "usual" costs of all construction <br /> activities associated with preparing a school site for construction (both <br /> "horizontal" [dirt] and "vertical" [building] construction). Examples of items to <br /> budget in this category include pre-grading and final grading of the site to <br /> include playing fields and playgrounds, installation of storm water run-off <br /> drainage, testing for soil suitability (rock), extension and/or installation of <br /> utilities, building structure and systems (includes General Contractor and all <br /> Sub-Contractors; satisfying municipal requirements such as storm water run- <br /> off drainage; and landscaping to include, when feasible, xeriscaping. <br /> ii) Hard Construction —Off-Site <br /> This category includes construction activities for the surrounding area (costs <br /> of "horizontal" construction). It does not include hard construction costs <br /> associated directly with the building and direct site (see Section 2 a above). <br /> Historically, these costs have been high in cost and are unique to individual <br /> projects. Examples of off-site development costs include water and sewer <br /> installations/extensions to the site, off-site road intersection improvements <br /> including, roundabouts, turn lanes and traffic signals or other traffic control <br /> devices, sidewalks, off-site environmental mitigation, construction of trails <br /> and/or greenway systems and other municipal or state requirements. All <br /> design work associated with these costs outlined in this section would be <br /> considered "Hard Construction — Off-Site" costs. <br /> c) Moveable Equipment <br /> Examples of readily moveable equipment include office furniture (desks, chairs, <br /> files, bookcases), cafeteria equipment (tables, seating, ovens, stoves, <br /> dishwashers), conference room furniture, gymnasium bleachers and athletic field <br /> bleachers. <br /> d) One-Time Start up Costs <br /> Examples of one-time start up costs may include media center collections, <br /> classroom textbooks and & supplies, musical instruments, science lab materials, <br /> art materials, playground equipment, cafeteria utensils and trays, athletic <br /> 17 <br />