Orange County NC Website
80 <br /> US 70 Multimodal Corridor Study <br /> Recommendations <br /> The following section identifies recommended projects and policies that should be <br /> implemented to achieve the plan's goals. <br /> 5.1 Plan Overview <br /> Using the critical issues identified in the existing conditions analyses, each goal was deconstructed into measurable, <br /> realistic objectives that when completed would indicate progress towards the US 70 vision. Implementing the <br /> recommendations of this plan would result in the achievement of these objectives. Objectives and associated policies <br /> often contribute to the success of more than one goal. <br /> The strategies outlined in the following sections are coded by an ID number that indicates the applicable segment, <br /> objective, and recommendation/policy. For example, 'Al SA" would indicate a strategy for Segment A and meeting <br /> Objective 15 by implementing Recommendation 1 for that objective.Tables 21-26 in Section 5.1.6 provides a concise <br /> summary of each objective by segment; Section 5.5 details the specific recommendations/policies needed to meet each of <br /> those objectives. <br /> 71 Recommendations <br />