Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 2:12:15 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 05-07-2024 Business Meeting
Minutes 05-07-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-028-Introduction of Bond order authorizing 300 mullion general obligation school bonds subject to voter approval first reading and scheduling of a related public hearing
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-006-Older Americans Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-007-Apraxia Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-021-Resolution supporting an application to the Local Government Commission for its approval of a County Financing Agreement
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-022-Resolution setting public hearing and authorizing filing of debt statements
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-023-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-024-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-025-Resolution Supporting the America 250 NC Program and Committee
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
64 <br /> US 70 Multimodal Corridor Study <br /> 4.4.5.7 2015 Mebane Bicycle and Pedestrian Plan <br /> This plan is intended to be a guide for future development and implementation of the City of Mebane's <br /> bicycle and pedestrian network. Most of the projects outlined and prioritized in the plan are local bicycle and <br /> pedestrian facilities. The plan was funded in part by Burlington Graham MPO and the MPO was identified as a <br /> potential partner for future bicycle and pedestrian programming with the City of Mebane. Specific to the US <br /> 70 corridor, the plan calls for: <br /> • Construct sidewalk along the north side of US 70/W. Center Street from N. Charles Street <br /> westward to Moore Street. <br /> • Construct sidewalk along the north side of US 70/W. Center Street from Ninth Street eastward to <br /> Supper Club Road. <br /> • Construct shared-use path along the north side of US 70 from Supper Club Road to Ashbury <br /> Boulevard. <br /> • Construct shared-use path along W. Holt Street from Lake Latham Road to Madison Street <br /> • Install intersection improvements, including high visibility crosswalks, upgraded curb ramps, and <br /> countdown pedestrian signals at the intersection of South Fifth Street and East Center Street/US <br /> 70 Business. <br /> • Extend the sidewalk on both sides of South Fifth Street from East Center Street across the railroad <br /> tracks. <br /> • Stripe bike lanes on North Fifth Street from Stagecoach Road to West Center Street. <br /> 4.4.5.8 2017 Mebane by Design Comprehensive Land Development Plan <br /> The Mebane by Design Comprehensive Land Development Plan is intended to be used by the City of Mebane <br /> and County partners to guide land development decisions. It is a long-range guide for public policy decisions <br /> concerning the overall growth and development of the Mebane community, and it focuses on the physical <br /> growth and development of Mebane and the study area. The plan calls for: <br /> • Improved pedestrian access across major streets, including US 70. <br /> • Sidewalk connectivity along and across US 70, public arts, and connecting NC-119 Bypass to US <br /> 70 and downtown with bicycle and pedestrian facilities. <br /> 4.4.5.9 2018 Mebane Downtown Vision Plan <br /> The Mebane Downtown Vision Plan was created to align the community and economic need of Downtown <br /> with City officials', local business owners', and residents' visions.The Vision Plan illustrates the potential for <br /> nearly 850,000 square feet of new residential and commercial uses in Downtown, and it includes the following <br /> recommendations: <br /> • An 8' two-way bike path with a curbed buffer on Center Street (US 70), lane reconfiguration, and <br /> street trees. <br /> • Connecting sidewalks on Clay, Center(US 70), 3rd, and 5t" Streets. <br /> • Improved pedestrian connectivity from Ruffin to Washington to 2nd Street, in coordination with <br /> the development of the Kingsdown property. <br /> 55 Existing Conditions and Critical Issues <br />
The URL can be used to link to this page
Your browser does not support the video tag.