Orange County NC Website
51 <br /> US 70 Multimodal Corridor Study <br /> Several signalized intersections have potential long queueing issues: <br /> • Buckhorn Road NB lane (Both peak hours) —only about 150' (-6 vehicles) from at-grade railroad <br /> crossing in PM. <br /> • Efland-Cedar Grove Road SB lane (AM peak only) <br /> • NC 86 (N. Churton Street) SB through/right-turn lane (AM peak hour) - may block turn lane access. <br /> • NC 86 (N. Churton Street) SB left-turn lane (AM peak only)— may exceed available storage. <br /> • NC 86 (N. Churton Street) NB through lanes (Both peak hours) <br /> • US 70 WB through lane at NC 86 (Both peak hours) —Significant queueing observed back to Orange <br /> High School Road which is more severe than reflected in Synchro analysis.Through lane queueing <br /> may block access to turn lanes that is compounding problems at the Orange High School Road <br /> intersection. <br /> • US 70 WB through lane at Orange High School Road (Both peak hours) —Significant queueing also <br /> observed during both peak hours. Right-turning vehicles may be stuck queueing in through lane <br /> impacting drop-off/pick-up at the middle school and high school. School-bound vehicles were also <br /> observed cutting through a church parking lot. <br /> • US 70 WB through lane at St. Mary's Road (PM peak only) - may block turn lane access and increase <br /> potential for rear-end crashes around curve. <br /> • US 70 EB through/right-turn lane at St. Mary's Road (AM peak only) — may block turn lane access and <br /> increase potential for rear-end crashes around curve. <br /> • Lawrence Road NB and SB lanes (Both peak hours) <br /> • US 70 WB through/right-turn lane at Lawrence Road (PM peak only)- may block turn lane access. <br /> • US 70 EB through/right-turn lane at Lawrence Road (AM peak only) - may block turn lane access. <br /> • US 70 WB through turn lane at Lawrence Road (PM peak only) — may block turn lane access. <br /> • Mt. Hermon Church Road/Pleasant Green Road NB and SB approaches (Both peak hours) <br /> • US 70 EB through lane at Mt. Hermon Church Road/Pleasant Green Road (AM peak only) — may block <br /> turn lane access and increase potential for rear-end crashes around curve. <br /> • NC 751 NB left-turn lane (PM peak only) — may exceed available storage. <br /> 4.3.6 Planned Improvements and Relevant Plans <br /> 4.3.6.1 North Carolina Department of Transportation 2020-2029 State Transportation <br /> Improvement Program (STIP) <br /> The current NCDOT 2020-2029 State Transportation Improvement Program (STIP) includes seven roadway <br /> projects in the project study area (see Figure 16). Each is summarized below: <br /> STIP# U-3109A— NC 119 <br /> U-3109A relocates NC 119 from 1-40/1-85 to north of SR 1921 (Mebane Rogers Road). The project was <br /> recently completed. <br /> STIP# RX-20078— Norfolk Southern Railroad <br /> RX-2007B proposes to install active warning devices at Norfolk Southern Railroad crossing 735145T near <br /> Efland. Construction is scheduled for Fiscal Year (FY) 2023. <br /> 42 Existing Conditions and Critical Issues <br />