Orange County NC Website
22 <br /> US 70 Multimodal Corridor Study <br /> Table 1 US 70 Corridor Plan Goals <br /> Goal 1: Manage increasing vehicular traffic congestion, including auto, EMS, and <br /> freight. <br /> • <br /> Goal 2: Prioritize bicycle and pedestrian connectivity through the corridor. <br /> Mobility Goal 3: Improve transit accessibility. <br /> /w,ftAor Goal 4: Guide transportation investment to protect community character. <br /> Goal 5: Prioritize pedestrian, bicycle, and transit connectivity within urban areas. <br /> Placemaking <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> Goal 7: Work towards Vision Zero. <br /> Goal 8: Reduce pedestrian-automobile conflicts. <br /> Goal 9: Improve multimodal access to jobs within the corridor. <br /> 1 <br /> 1 � <br /> Goal 10: Improve multimodal access to jobs outside the corridor. <br /> Job Access <br /> Goal 11: Improve multimodal access to parks throughout the corridor. <br /> IGoal 12: Reduce wildlife-automobile conflicts. <br /> Natural <br /> Environment Goal 13: Ensure long term protection of local watersheds. <br /> 13 Goal-Setting <br />