Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 2:12:15 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 05-07-2024 Business Meeting
Minutes 05-07-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-028-Introduction of Bond order authorizing 300 mullion general obligation school bonds subject to voter approval first reading and scheduling of a related public hearing
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-006-Older Americans Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-007-Apraxia Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-021-Resolution supporting an application to the Local Government Commission for its approval of a County Financing Agreement
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-022-Resolution setting public hearing and authorizing filing of debt statements
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-023-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-024-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-025-Resolution Supporting the America 250 NC Program and Committee
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
160 <br /> US 70 Multimodal Corridor Study <br /> • and Orange Grove Road stops. <br /> • F.11.2: Shift partnerships with service <br /> providers in Orange County to the new US TPM Grant Mobility, Job Transit <br /> 70 Business location proposed in the NC 86 Access <br /> Connector Study, Phase II (2021). <br /> • F.12.1: Add sharrows and signage to <br /> • establish a bicycle route on the length of SS4A Mobility, Job Bike <br /> Meadowlands Drive. Access <br /> F.13.1: Shift regional transit services to the <br /> • Mobility, Job <br /> new US 70 Business location proposed in TPM Grant Transit <br /> - • - <br /> the NC 86 Connector Study, Phase II (2021). Access <br /> F.14: Further connect the I <br /> F.14.1: Connect Mountains-to-Sea trail to Mobility, <br /> trail system to the urban US Business with a shared-use path via SS4A Safety, Natural Bike, <br /> active transportation Elizabeth Brady Road. Environment <br /> network. I <br /> A.17.1: Require best management practices <br /> F.15: Ensure • (BMPs) with regard to erosion control and Local, Natural <br /> Policy <br /> of local watersheds. hydraulic design in future transportation Private Environment <br /> and land development projects. <br /> 151 Implementation and Funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.