Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 2:12:15 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 05-07-2024 Business Meeting
Minutes 05-07-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-028-Introduction of Bond order authorizing 300 mullion general obligation school bonds subject to voter approval first reading and scheduling of a related public hearing
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-006-Older Americans Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-007-Apraxia Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-021-Resolution supporting an application to the Local Government Commission for its approval of a County Financing Agreement
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-022-Resolution setting public hearing and authorizing filing of debt statements
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-023-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-024-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-025-Resolution Supporting the America 250 NC Program and Committee
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
159 <br /> US 70 Multimodal Corridor Study <br /> • <br /> r, W <br /> F.7.1: Construct 5-foot sidewalks on the <br /> NCDOT <br /> north and south sides of US 70 Business Mobility, <br /> STIPPe <br /> from NC 86 to Palmer Grove Church Road. STIP Safety <br /> • F.7.2:Widen the shoulders on US 70 <br /> Business from NC 86 to Palmer Grove <br /> NCDOT Mobility, <br /> Church Road to provide a minimum 5-foot STIP SafetyBike <br /> paved shoulder with bicycle pattern rumble <br /> strips. <br /> Slow automobileF.8.1: Reduce posted speed limit on US 70 <br /> throughouttraffic business to 35 miles per hour between NC NCDOT Safety Auto <br /> corridor. 86 and US 70. <br /> F.9.1: Establish a maintenance agreement <br /> between NCDOT and Orange County for Local, Mobility, Ped <br /> new and existing pedestrian facilities on US NCDOT Safety <br /> F.9: Extend sidewalk 70. <br /> connectivity to <br /> anticipated growth <br /> F.9.2: Require developers building on land <br /> parcels fronting US 70 to either construct Private Mobility, <br /> sidewalk along their frontages, dedicate Safety Ped <br /> ROW for future construction, or pay in lieu. <br /> F.10: Establish gateways F.10.1: Invest in streetscaping projects on <br /> to Hillsborough. US 70 Business from Tuscarora Drive to US Private Placemaking Ped <br /> 70 Bypass. <br /> FA 1: Expand transit by F.11.1: Extend Hillsborough Circulator TPM Grant Mobility, Job Transit <br /> partnerships with service service to the planned Cornerstone Court Access <br /> 150 Implementation and Funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.