Orange County NC Website
153 <br /> US 70 Multimodal Corridor Study <br /> School Road intersection. <br /> D.1.3: Upgrade the US 70/N. Scotswood Blvd. NCDOT Mobility, <br /> Intersection <br /> intersection to a roundabout. STIP, Local Safety <br /> • • D.2.1: Implement the Miller Road/Latta Road <br /> Mobility, Job <br /> • • • • park and ride service proposed in the TPM Grant Access Transit <br /> DCHCMPO CTP (updated April 2023). <br /> D.3: Manage travel D.3.1: Conduct NCDOT Municipal School <br /> demand resulting from Transportation Assistance (MSTA) school NCDOT <br /> trips to and from study to address circulation, queuing, and STIP Mobility Auto <br /> storage needs specific to Orange High and <br /> Middle School complex. <br /> D.4.1: Increase the frequency and service <br /> D.4: Improve bus service hours of Orange County's Orange-Alamance <br /> Connector and Hillsborough Circulator TPM Grant Mobility Transit <br /> reliability. routes. <br /> ■ <br /> D.5.1: Update all existing bus stops to <br /> Daccessibility and safety standards, complete <br /> Mobility, <br /> accessibilitywith shelters, seating, lighting, visible and TPM Grant Safety Ped, Transit <br /> bus stops. audible information, and appropriate <br /> pedestrian and ADA connectivity. <br /> D.6: Construct accessible D.6.1: Add an accessible, safe bus shelter with <br /> Mobility, <br /> bus shelters that serve appropriate pedestrian connectivity on TPM Grant Safety, Job Ped, Transit <br /> Orange High School Road that serves Orange <br /> Access <br /> employment centers High School. <br /> D.7.1:Add an accessible, safe bus shelter with Mobility, <br /> D.7: Construct accessible appropriate pedestrian connectivity on Miller TPM Grant Safety, Job Ped, Transit <br /> bus shelters that serve Road. Access <br /> Hillsborough's D.7.2:Add an accessible, safe bus shelter with Mobility, <br /> residential communities. appropriate pedestrian connectivity on TPM Grant Safety, Job Ped, Transit <br /> Scotswood Boulevard. Access <br /> D.8: Accommodate all D.8.1: Include a 10-foot shared-use path on NCDOT Mobility, <br /> transportation modesthe north side and a 5-foot sidewalk on theBike, Ped <br /> STIP Safety <br /> roadway south side of US 70 from NC 86 to Palmers <br /> 144 Implementation and Funding <br />