Orange County NC Website
150 <br /> US 70 Multimodal Corridor Study <br /> C.12.1: Install high-visibility pedestrian <br /> Placemaking, <br /> crossing signage at the Faucette Mill SS4A Safety Intersection <br /> Road/Torain Street intersection. <br /> C.12.2: Include high-visibility crossings in all <br /> future sidewalk construction on Faucette Mill <br /> • • - • - <br /> Road, Torain Street, and Rainey Avenue SS4A Placemaking, Ped <br /> where the pedestrian network would Safety <br /> otherwise be interrupted by roadway. <br /> C.12.3: Install high-visibility pedestrian <br /> crossing signage and pedestrian pads at the SS4A Placemaking, Intersection <br /> Rainey Avenue/Torain Street intersection. Safety <br /> • • • C.13.1: Upgrade the US 70/Lakeshore Drive NCDOT Placemaking, <br /> Intersection <br /> • • • intersection to a roundabout. STIP, Local Safety <br /> C.14.1: Construct shared-use path along the NCDOT Mobility, <br /> east side of NC 86 from US 70 to Corbin Placemaking, Bike, Ped <br /> STIP <br /> • Street. Safety <br /> 141 Implementation and Funding <br />