Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 2:12:15 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 05-07-2024 Business Meeting
Minutes 05-07-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-028-Introduction of Bond order authorizing 300 mullion general obligation school bonds subject to voter approval first reading and scheduling of a related public hearing
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-006-Older Americans Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-007-Apraxia Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-021-Resolution supporting an application to the Local Government Commission for its approval of a County Financing Agreement
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-022-Resolution setting public hearing and authorizing filing of debt statements
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-023-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-024-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-025-Resolution Supporting the America 250 NC Program and Committee
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
148 <br /> US 70 Multimodal Corridor Study <br /> • • C.2.1: Implement the Faucette Mill Road park <br /> Mobility,Job <br /> • • • . and ride service proposed in the DCHCMPO TPM Grant Access Auto, Transit <br /> CTP (updated April 2023). <br /> • • C.3.1: Extend PART Route 4 service to <br /> • • • existing North Carolina Drivers License and TPM Grant Mobility Transit <br /> Orange County Courthouse stops. <br /> C.4.1:Add sharrows and signage to establish <br /> bike route along the length of Faucette Mill Mobility, <br /> Road north of the Hillsborough Town SS4A Safety Bike <br /> border. <br /> • C.4.2: Construct an off-road bicycle path that <br /> • • connects Faucette Mill Road with Lebanon SS4A Mobility, Bike <br /> Safety <br /> • • Road across the Eno River. <br /> C.4.3: Install signage to encourage bicycle SS4A Mobility, Bike <br /> use of Faucette Mill Road. Safety <br /> C.5.1: Increase the frequency and service <br /> TPM Grant Mobility Transit <br /> hours of regional transit routes. <br /> C.S: Improve bus service C.5.2: Increase the frequency and service <br /> hours of Orange County's Orange-Alamance <br /> TPM Grant Mobility Transit <br /> Connector and Hillsborough Circulator <br /> routes. <br /> C.6.1: Update all existing bus stops to <br /> Improveaccessibility and safety standards, complete <br /> accessibilitywith shelters, seating, lighting, visible and TPM Grant Mobility, <br /> Safety Ped, Transit <br /> bus stops. audible information, and appropriate <br /> pedestrian and ADA connectivity.C.7: Construct paired , <br /> C.7.1:Add an accessible, safe bus shelter <br /> acrossbus stops with appropriate pedestrian connectivity TPM Grant Mobility, Ped, Transit <br /> from existing facilities. across US 70 from the existing North Safety <br /> Carolina Drivers License stop. <br /> 139 Implementation and Funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.