Browse
Search
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 05-07-2024 Business Meeting
>
Agenda 05-07-24; 6-b - Approval of the Orange County US 70 Multimodal Corridor Study (MCS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 1:48:49 PM
Creation date
5/2/2024 2:12:15 PM
Metadata
Fields
Template:
BOCC
Date
5/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for May 7, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 05-07-2024 Business Meeting
Minutes 05-07-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-028-Introduction of Bond order authorizing 300 mullion general obligation school bonds subject to voter approval first reading and scheduling of a related public hearing
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-006-Older Americans Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-007-Apraxia Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-021-Resolution supporting an application to the Local Government Commission for its approval of a County Financing Agreement
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-022-Resolution setting public hearing and authorizing filing of debt statements
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-023-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-024-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-025-Resolution Supporting the America 250 NC Program and Committee
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
144 <br /> US 70 Multimodal Corridor Study <br /> • Buckhorn Road, include multimodal facilities. <br /> Expand A.16.1: Extend regional transit service to the <br /> regional transit planned Supper Club Road mobile home Mobility,Job <br /> services to community stop. TPM Grant Access Transit <br /> corridor.residential centers in <br /> the <br /> A.17: Ensure A.17.1: Require best management practices <br /> (BMPs) with regard to erosion control and Natural <br /> • - Local, Private Policy <br /> hydraulic design in future transportation and Environment <br /> land development projects. <br /> 6.3.1.2 Segment B <br /> Improvementlor <br /> V Potential <br /> Objective Recommendation/PolicyGoals <br /> Source <br /> congestion delay times r <br /> in response to B.1.1:When US 70 is widened to a four-lane NCDOT <br /> divided facility from Buckhorn Road to Lloyds Mobility Auto <br /> STIP <br /> . growth <br /> • - • • traffic <br /> Dairy Road, include multimodal facilities. <br /> throughcorridor. <br /> B.2.1: Construct exclusive left- and right-turn <br /> NCDOT <br /> lanes on all approaches at the US 70/Efland STIP Mobility Intersection <br /> B.2: Improve access Cedar Grove Road intersection. <br /> between US 70 and 1 <br /> ' ' B.2.2: Redesign the US 70/185 Connector <br /> NCDOT <br /> interchange to a fully directional configuration, STIP Mobility Intersection <br /> such as a "dogbone" roundabout. <br /> 135 Implementation and Funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.