Orange County NC Website
128 <br /> US 70 Multimodal Corridor Study <br /> o C.7.2: Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US 70 from the <br /> existing Faucette Mill Road/Cornelius Street stop. <br /> o C.7.3:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US 70 from the <br /> existing US 70/Rainey Avenue stop. <br /> Relevant Plan Goals: <br /> Goal 3: Improve transit accessibility <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> Goal 7: Work towards Vision Zero. <br /> 4AGoal 8: Reduce pedestrian-automobile conflicts. <br /> 5.4.1.7 Construct accessible bus shelters that serve Hillsborough's residential communities. <br /> o C.8.1: Replace Lakeshore Drive stop with a stop serving Bennetts Mobile Home Park and surrounding <br /> communities. <br /> o D.7.1: Add an accessible, safe bus shelter with appropriate pedestrian connectivity on Miller Road. <br /> o D.7.2: Add an accessible, safe bus shelter with appropriate pedestrian connectivity on Scotswood <br /> Boulevard. <br /> o F.6.1:Add an accessible, safe bus shelter with appropriate pedestrian connectivity near Orange Grove <br /> Road and Elfin Boulevard. <br /> Relevant Plan Goals: <br /> AkGoal 3: Improve transit accessibility. <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> Goal 9: Improve multimodal access to jobs within the corridor. <br /> 119 Recommendations <br />