Orange County NC Website
126 <br /> US 70 Multimodal Corridor Study <br /> Relevant Plan Goals: <br /> Goal 3: Improve transit accessibility <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> 1 <br /> 0 Goal 9: Improve multimodal access to jobs within the corridor. <br /> 1 <br /> a Goal 10: Improve multimodal access to jobs outside the corridor. <br /> 5.4.1.4 Construct accessible bus shelters that serve Efland's residential communities. <br /> 0 13.7.1: Add accessible, safe bus shelters with appropriate pedestrian connectivity either side of US 70 that <br /> serve communities near Ashwick Drive. <br /> o B.7.2: Add accessible, safe bus shelters with appropriate pedestrian connectivity either side of US 70 that <br /> serve the Graham Trailer Park. <br /> Relevant Plan Goals: <br /> Goal 3: Improve transit accessibility <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> ID <br /> Goal 9: Improve multimodal access to jobs within the corridor. <br /> 1 <br /> Goal 10: Improve multimodal access to jobs outside the corridor. <br /> 117 Recommendations <br />