Orange County NC Website
122 <br /> US 70 Multimodal Corridor Study <br /> 5.3.1.6 Establish gateways to Hillsborough. <br /> Placemaking through roundabouts and streetscaping will calm traffic approaching Hillsborough: <br /> o C.13.1: Upgrade the US 70/Lakeshore Drive intersection to a roundabout. <br /> o DA 1.1: Upgrade the intersection of US 70, US 70 Business, and Palmer's Grove Church Road to a <br /> roundabout. <br /> o F.10.1: Invest in streetscaping projects on US 70 Business from Tuscarora Drive to US 70 Bypass. <br /> Relevant Plan Goals: <br /> /WAAMpGoal 4: Guide transportation investment to protect community character. <br /> Goal 7: Work towards Vision Zero. <br /> 5.3.1.7 Further connect the trail system to the urban active transportation network. <br /> Strategically expanding the bicycle-pedestrian network will strengthen the ties between Hillsborough and its surrounding <br /> natural environment: <br /> o F.14.1: Connect Mountains-to-Sea trail to US Business with a shared-use path via Elizabeth Brady Road. <br /> Relevant Plan Goals: <br /> Goal 11: Improve multimodal access to parks throughout the corridor. <br /> 113 Recommendations <br />