Orange County NC Website
118 <br /> US 70 Multimodal Corridor Study <br /> Relevant Plan Goals: <br /> hkGoal 2: Prioritize bicycle and pedestrian connectivity through the corridor. <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> PRU7 Bike lwp PRenient TS <br /> � Bike Improvement <br /> 319., EXISTING INFRASTRUCTURE <br /> —Sidewalk <br /> •• Planned sidewalk <br /> Trail <br /> •- Plarned Prut-ted Bike Fadlity <br /> Planned Designated Bike Route <br /> J <br /> r <br /> MEBANE <br /> ti 70 <br /> i <br /> �19 <br /> ,r <br /> 1 <br /> N <br /> I.lilr: <br /> Figure 28 Recommended Complementary Bike/Ped Improvements, Segments A/B <br /> 109 Recommendations <br />