Orange County NC Website
115 <br /> US 70 Multimodal Corridor Study <br /> Goal 7: Work towards Vision Zero. <br /> 5.3.1.3 Enhance downtown Mebane's sense of place. <br /> Beautifying the street environment will enhance Mebane's aesthetic while having a calming effect on traffic.Wayfinding, <br /> lighting, and street furniture improvements will create a safe pedestrian-centric destination that contributes connectivity <br /> and economic benefits: <br /> o A.11.1: Invest in streetscaping projects between Charles and Ninth Streets. <br /> Relevant Goals: <br /> IWAAMpo Goal 4: Guide transportation investment to protect community character. <br /> /W,4At%J Goal 5: Prioritize pedestrian, bicycle, and transit connectivity within urban areas. <br /> 4AGoal 6: Increase the comfort of non-automobile roadway users. <br /> 4AGoal 7: Work towards Vision Zero. <br /> 5.3.1.4 Complete the sidewalk contiguity in downtown Mebane. <br /> Building on existing plans in Mebane, completing the pedestrian network will benefit the character, economy, and safety <br /> of the community: <br /> o A.12.1: Maintain existing sidewalk on US 70's north side between Mebane Community Park and 91" Street. <br /> o A.12.2: Combine and minimize curb cuts and wide, flush frontages as parcels redevelop. <br /> Relevant Goals: <br /> /WwAyp <br /> Goal 4: Guide transportation investment to protect community character. <br /> /,4At% <br /> OGoal 5: Prioritize pedestrian, bicycle, and transit connectivity within urban areas. <br /> 106 Recommendations <br />