Orange County NC Website
'6RAFT <br /> 1 Cy Stober: Section 6.8 of the UDO allows for some impacts to the buffer with mitigation and that has, the staff review <br /> 2 has addressed that for that 430-foot stretch along the northern property line. If this were to be reviewed <br /> 3 administratively, we've found it to be sufficiently consistent with the ordinance requirements, but it is a deviation from <br /> 4 the general standard of 30 feet. <br /> 5 <br /> 6 Nathan Robinson: Mm hmm. Okay, so that's when it says, "shall be modified to preserve the existing farm road," that's <br /> 7 the conversation that you were talking about right here? <br /> 8 <br /> 9 Cy Stober: Yes, Mr. Robinson. <br /> 10 <br /> 11 Nathan Robinson: Okay. <br /> 12 <br /> 13 Bobby Tucker: And, I mean, when you, when you look at the, the proposed limits of disturbance, I mean, we are going <br /> 14 to far exceed the tree buffer on most of the property. Looking what's being preserved and where the active drain field is <br /> 15 probably going to be on the east side, you know, that's still going to be wooded. As well. <br /> 16 <br /> 17 Beth Bronson: So, you're looking at the eastern drain field, not the center of the field? <br /> 18 <br /> 19 Bobby Tucker: Yeah, that's sort of, I mean, at this point, we're kind of looking at tucking most of the active in the eastern <br /> 20 side, although, you know, there was maybe some discussion of creating kind of more of a grove and opening the center <br /> 21 area where you could put active. But, you know, it's sort of to be determined because we've not had the county been <br /> 22 out to verify the findings of the preliminary soils report, so we, I've just created enough area that should be adequate, <br /> 23 even if there are some areas that are thrown out for some reason, but in my experience—and I do a lot of onsite <br /> 24 wastewater design, I mean, we're should be fine. <br /> 25 <br /> 26 Beth Bronson: And I could be confused about the process but NCDOT, as far as, like, your entrance and all of that has <br /> 27 approved the one entrance exit. There's no requirement for a second one? <br /> 28 <br /> 29 Bobby Tucker: We were pushing for a second, and the fire marshal was pushing for two. DOT was not okay with the <br /> 30 existing entrance, which is where this hammerhead is shortened. Do you kind of see where it's. <br /> 31 <br /> 32 Beth Bronson: At the top? <br /> 33 <br /> 34 Bobby Tucker: Facing the road? <br /> 35 <br /> 36 Beth Bronson: Yes. <br /> 37 <br /> 38 Bobby Tucker: That's about where the existing entrance is now. But the site distance is not sufficient for them for what <br /> 39 they would prefer. <br /> 40 <br /> 41 Beth Bronson: So, okay, so even if it was an entrance only or an exit only— <br /> 42 <br /> 43 Bobby Tucker: Doesn't matter? <br /> 44 <br /> 45 Beth Bronson: The site doesn't. <br /> 46 <br /> 47 Bobby Tucker: For them, yeah. <br /> 48 <br /> 49 Beth Bronson: Okay. Because of the bend in the road? <br /> 50 <br /> 24 <br />